NOTE: Only PART 2 GENERAL REQUIREMENTS have been updated this quarter.
Use the Standard Template to develop RFP requirements for projects that do not utilize the Model RFPs.
FOR ALL DOCUMENTS AND ATTACHMENTS–Download the complete set zipped file. You may also add your company name, work order number, and project name to the documents in a customizable set.
FOR INDIVIDUAL DOCUMENTS–Find the document in the list below and download the appropriate format.
To view a list of the latest updates made to the DB-UFGS see Design-Build UFGS Revision/Change List
Questions, comments, suggestions and recommended changes for the NDBM are welcome and should be submitted as a Criteria Change Request. To submit a Criteria Change Request, click on the CCR link next to the appropriate document below.
These documents are available in the following formats: Microsoft Word, Excel and SpecsIntact in compressed ZIP
Adobe Acrobat (PDF) | Microsoft Word (DOCX) | SpecsIntact (SEC) in compressed ZIP
In PART 2 - GENERAL REQUIREMENTS, the indicates the file is an attachment to the UFGS.
Title | Date | View | CCR |
---|---|---|---|
STANDARD TEMPLATE COMPLETE SET | 03-24-2025 | ||
PART 2 - GENERAL REQUIREMENTS | |||
1.0 Table of Contents (RFP Parts 2-6) | 03-24-2025 | ||
UFGS 01 14 00 Work Restrictions | 11-01-2022 | ||
UFGS 01 20 00 Price and Payment Procedures | 11-01-2020 | ||
UFGS 01 30 00 Administrative Requirements | 11-01-2020 | ||
UFGS 01 31 19.05 20 Concept Design Workshop (CDW) | 02-01-2021 | ||
UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) | 08-01-2023 | ||
UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) | 11-01-2023 | ||
UFGS 01 33 00.05 20 Construction Submittal Procedures | 05-01-2014 | ||
UFGS 01 33 10.05 20 Design Submittal Procedures | 05-01-2017 | ||
UFGS 01 33 29 Sustainability Requirements and Reporting | 02-01-2021 | ||
UFGS 01 35 13 Special Project Procedures | 11-01-2020 | ||
UFGS 01 35 26 Governmental Safety Requirements | 05-01-2024 | ||
UFGS 01 45 00 Quality Control | 08-01-2023 | ||
UFGS 01 45 35 Special Inspections | 05-01-2024 | ||
UFGS 01 50 00 Temporary Construction Facilities and Controls | 11-01-2020 | ||
UFGS 01 57 19 Temporary Environmental Controls | 08-01-2022 | ||
UFGS 01 74 19 Construction Waste Management and Disposal | 02-01-2019 | ||
UFGS 01 78 00 Closeout Submittals | 05-01-2019 | ||
UFGS 01 78 23 Operation & Maintenance Data | 05-01-2023 | ||
UFGS 01 78 24.00 20 Facility Data Workbook (FDW) | 05-01-2023 | ||
UFGS 01 91 00.15 Building Commissioning | 05-01-2023 | ||
UFGS 01 91 19 Building Enclosure Commissioning | 05-01-2023 | ||
PART 3 - PROJECT PROGRAM | |||
1.0 Project Description | 09-01-2022 | ||
2.0 Project Objectives | 06-01-2023 | ||
3.0 Site Analysis | 09-01-2022 | ||
4.0 Building Requirement | 09-01-2022 | ||
5.0 Room Requirements | 09-01-2022 | ||
6.0 Engineering System Requirements | |||
– ESR-A10 Foundations | 02-01-2018 | ||
– ESR-A20 Basement Construction | 02-01-2018 | ||
– ESR-B10 Superstructure | 09-01-2022 | ||
– ESR-B20 Exterior Closure | 09-01-2022 | ||
– ESR-B30 Roofing | 06-01-2023 | ||
– ESR-C10 Interior Construction | 09-01-2022 | ||
– ESR-C20 Stairs | 02-01-2018 | ||
– ESR-C30 Interior Finishes | 09-01-2022 | ||
– ESR-D10 Conveying | 02-01-2018 | ||
– ESR-D20 Plumbing | 09-01-2022 | ||
– ESR-D30 HVAC | 09-01-2022 | ||
– ESR-D40 Fire Protection | 02-01-2018 | ||
– ESR-D50 Electrical | 06-01-2023 | ||
– ESR-E10 Equipment | 09-01-2022 | ||
– ESR-E20 Furnishings | 09-01-2022 | ||
– ESR-F10 Special Construction | 02-01-2018 | ||
– ESR-F20 Selective Building Demolition | 09-01-2022 | ||
– ESR-G10 Site Preparation | 09-01-2022 | ||
– ESR-G20 Site Improvements | 09-01-2022 | ||
– ESR-G30 Site Civil/Mechanical Utilities | 09-01-2022 | ||
– ESR-G40 Site Electrical Utilities | 09-01-2022 | ||
– ESR-H10 Waterfront Structures | 02-01-2018 | ||
– ESR-H20 Graving Drydocks | 02-01-2018 | ||
– ESR-H30 Coastal Protection | 02-01-2018 | ||
– ESR-H40 Navigation Dredging and Reclamation | 02-01-2018 | ||
– ESR-H50 Waterfront Utilities | 02-01-2018 | ||
– ESR-H60 Waterfront Demolition | 02-01-2018 | ||
– ESR-H70 Waterfront ATFP | 02-01-2018 | ||
PART FOUR - PERFORMANCE TECHNICAL SPECIFICATIONS | |||
PTS-A10 Foundations | 12-15-2018 | ||
PTS-A20 Basement Construction | 12-15-2018 | ||
PTS-B10 Superstructure | 12-15-2018 | ||
PTS-B20 Exterior Enclosure | 06-01-2023 | ||
PTS-B30 Roofing | 06-01-2023 | ||
PTS-B30 Appendix A Forms | 09-01-2022 | ||
PTS-C10 Interior Construction | 09-01-2022 | ||
PTS-C20 Stairs | 09-01-2022 | ||
PTS-C30 Interior Finishes | 09-01-2022 | ||
PTS-D10 Conveying | 06-01-2023 | ||
PTS-D20 Plumbing | 12-15-2018 | ||
PTS-D30 HVAC | 06-01-2023 | ||
PTS-D40 Fire Protection | 12-15-2018 | ||
PTS-D50 Electrical | 09-01-2022 | ||
PTS-E10 Equipment | 09-01-2022 | ||
PTS-E20 Furnishings | 09-01-2022 | ||
PTS-F10 Special Construction | 09-01-2022 | ||
PTS-F20 Selective Building Demolition | 09-01-2022 | ||
PTS-G10 Site Preparation | 09-01-2022 | ||
PTS-G20 Site Improvements | 09-01-2022 | ||
PTS-G30 Site Civil/Mechanical Utilities | 09-01-2022 | ||
PTS-G40 Site Electrical Utilities | 09-01-2022 | ||
PTS-H10 Waterfront Structures | 09-01-2022 | ||
PTS-H30 Coastal Protection | 09-01-2022 | ||
PTS-H40 Navigation Dredging and Reclamation | 12-15-2018 | ||
PTS-H50 Waterfront Utilities | 06-01-2023 | ||
PTS-H60 Waterfront Demolition | 06-01-2023 | ||
PTS-Z10 General Performance Technical Specification | 06-01-2023 |