Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | UFGS Section | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|---|
Aug-2018 | A | UFGS 01 91 00.15 Building Commissioning | May-2016 | C | 4 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 02 01 50 Operation, Maintenance and Process Monitoring for Soil Vapor Extraction (SVE) Systems | May-2010 | D |
Superseded by UFGS 02 62 16.13 10 OPERATION, MAINTENANCE AND PROCESS MONITORING FOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS. Note: The last published PDF version of this Section is available in the previous release in the <a href="https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-uf… Archives</a>. |
|
Aug-2018 | A | UFGS 02 62 13.00 10 Air and Steam Stripping | Aug-2018 | N | Superseding UFGS 11 24 27 AIR STRIPPER. Complete review and update including section number and title changes. | |
Aug-2018 | A | UFGS 02 62 16 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems | Feb-2010 | D |
Superseded by UFGS 02 62 16.16 10 COMMISSIONING AND DEMONSTRATION FOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS. Note: The last published PDF version of this Section is available in the previous release in the <a href="https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-uf… Archives</a>. |
|
Aug-2018 | A | UFGS 02 62 16.13 10 Operation, Maintenance and Process Monitoring for Soil Vapor Extraction (SVE) Systems | Aug-2018 | N | Superseding UFGS 02 01 50 OPERATION, MAINTENANCE AND PROCESS MONITORING FOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS. Complete review and update including section number change. | |
Aug-2018 | A | UFGS 02 62 16.16 10 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems | Aug-2018 | N | Superseding UFGS 02 62 16 COMMISSIONING AND DEMONSTRATION FOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS. Complete review and update including section number change. | |
Aug-2018 | A | UFGS 03 23 00 Stressed Tendon Reinforcing | May-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 03 30 00 Cast-In-Place Concrete | May-2014 | C | 25 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 05 05 23.13 10 Ultrasonic Inspection of Weldments | Aug-2018 | R | Complete review and update. | |
Aug-2018 | A | UFGS 05 05 23.16 Structural Welding | Aug-2018 | R | Complete review and update. | |
Aug-2018 | N | UFGS 05 12 00 Structural Steel | Aug-2018 | R | This specification was updated and revised to current industry best practices, standards, guidelines, codes, and specifications. | |
Aug-2018 | A | UFGS 05 21 00 Steel Joist Framing | May-2015 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 05 30 00 Steel Decks | May-2015 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 05 40 00 Cold-Formed Metal Framing | May-2015 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 05 50 13 Miscellaneous Metal Fabrications | May-2017 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 05 50 14 Structural Metal Fabrications | Aug-2018 | R | Complete review and update. | |
Aug-2018 | A | UFGS 05 50 15 Civil Works Fabrications | Aug-2018 | R | Complete review and update. | |
Aug-2018 | A | UFGS 05 59 10 Rolling Cover for Aviation Refueling Vaults | Aug-2018 | R | Complete review and update. | |
Aug-2018 | A | UFGS 05 59 13 Fabrication of Hydraulic Steel Structures | Aug-2009 | D |
Superseded by UFGS 05 59 20 FABRICATION OF HYDRAULIC STEEL STRUCTURES. Note: The last published PDF version of this Section is available in the previous release in the <a href="https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-uf… Archives</a>. |
|
Aug-2018 | A | UFGS 05 59 20 Fabrication Of Hydraulic Steel Structures | Aug-2018 | N | Superseding UFGS 05 59 13 FABRICATION OF HYDRAULIC STEEL STRUCTURES. Complete review and update including section number change. | |
Aug-2018 | N | UFGS 06 10 00 Rough Carpentry | Aug-2016 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 06 20 00 Finish Carpentry | Aug-2016 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 06 61 16 Solid Surfacing Fabrications | Aug-2010 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 21 13 Board and Block Insulation | Feb-2016 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 21 16 Mineral Fiber Blanket Insulation | Nov-2011 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 21 23 Loose Fill Thermal Insulation | May-2011 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 22 00 Roof and Deck Insulation | Feb-2016 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 24 00 Exterior Insulation and Finish Systems | May-2011 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 27 19.01 Self-Adhering Air Barriers | May-2017 | C | 3 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 27 26 Fluid-Applied Membrane Barriers | May-2017 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 27 36 Spray Foam Air Barriers | May-2017 | C | 3 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 31 13 Asphalt Shingles | Aug-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 41 13 Metal Roof Panels | May-2011 | C | 4 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 51 13 Built-Up Asphalt Roofing | May-2012 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 52 00 Modified Bituminous Membrane Roofing | May-2012 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing | May-2012 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 07 54 19 Polyvinyl Chloride Roofing | Feb-2013 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing | May-2011 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 60 00 Flashing and Sheet Metal | May-2017 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 61 14.00 20 Steel Standing Seam Roofing | Aug-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 61 15.00 20 Aluminum Standing Seam Roofing | Aug-2016 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 07 92 00 Joint Sealants | Aug-2016 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 08 11 13 Steel Doors and Frames | Feb-2010 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 08 11 16 Aluminum Doors and Frames | May-2017 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 08 14 00 Wood Doors | Aug-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 08 31 00 Access Doors and Panels | May-2017 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | S | UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts | Nov-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 08 44 00 Curtain Wall and Glazed Assemblies | Aug-2011 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 08 51 13 Aluminum Windows | May-2011 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 08 51 23 Steel Windows | Aug-2011 | C | 3 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 08 52 00 Wood Windows | Aug-2011 | C | 3 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 08 53 00 Plastic Windows | Aug-2011 | C | 3 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 08 60 45 [Skylights] [ and ] [Translucent Panels] | Feb-2012 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 08 81 00 Glazing | Aug-2011 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 09 22 00 Supports for Plaster and Gypsum Board | Feb-2010 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 09 22 36 Lath | Jan-2008 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 24 23 Cement Stucco | Aug-2017 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 09 26 00 Veneer Plaster | Aug-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 09 29 00 Gypsum Board | Aug-2016 | C | 3 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 30 10 Ceramic, Quarry, and Glass Tiling | Aug-2017 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 35 16 Chemical-Resistant Quarry Tiling | Aug-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 51 00 Acoustical Ceilings | Aug-2017 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 62 38 Static-Control Flooring | Aug-2017 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 09 64 00 Portable (Demountable) Wood Flooring | Aug-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 64 23 Wood Parquet Flooring | Aug-2016 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 64 29 Wood Strip and Plank Flooring | Aug-2016 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 09 64 66 Wood Athletic Flooring | Aug-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 65 00 Resilient Flooring | Aug-2010 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 65 66 Resilient Athletic Flooring | Aug-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 66 13 Portland Cement Terrazzo Flooring | Aug-2016 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 66 16 Terrazzo Floor Tile | Aug-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 66 23 Resinous Matrix Terrazzo Flooring | Aug-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 67 23.14 Chemical Resistant Resinous Flooring | Aug-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 68 00 Carpeting | Nov-2017 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 69 13 Rigid Grid Access Flooring | Nov-2015 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 69 19 Stringerless Access Flooring | Nov-2015 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 72 00 Wallcoverings | Aug-2017 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 09 84 20 Acoustical Wall Panels | Aug-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 09 90 00 Paints and Coatings | May-2011 | C | 3 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 09 97 23 Metallic Type Conductive/Spark Resistant Concrete Floor Finish | Aug-2018 | R | This specification was updated and revised to current industry best practices, standards, guidelines, codes, and specifications. | |
Aug-2018 | A | UFGS 10 11 00 Visual Display Units | Aug-2017 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 10 14 00.20 Interior Signage | Aug-2017 | C | 2 | Added bracketed item to paragraph 1.4.1 in response to CCR 6638. |
Aug-2018 | A | UFGS 10 21 13 Toilet Compartments | Aug-2017 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 10 22 13 Wire Mesh Partitions | Aug-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 10 22 19 Demountable and Moveable Partitions | Aug-2017 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 10 22 26.13 Accordion Folding Partitions | Aug-2016 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 10 22 26.23 Coiling Partitions | Aug-2016 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 10 22 39 Folding Panel Partitions | Aug-2017 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 10 22 43 Sliding Partitions | Aug-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 10 26 00 Wall and Door Protection | Aug-2017 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 10 28 13 Toilet Accessories | Aug-2017 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 11 24 27 Air Stripper | Oct-2007 | D |
Superseded by UFGS 02 62 13.00 10 AIR AND STEAM STRIPPING. Note: The last published PDF version of this Section is available in the previous release in the <a href="https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-uf… Archives</a>. |
|
Aug-2018 | N | UFGS 11 31 13 Electric Kitchen Equipment | Aug-2017 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 11 44 00 Food Cooking Equipment | Aug-2017 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 11 47 00 Ice Machines | Aug-2017 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 11 48 00 Cleaning and Disposal Equipment | Aug-2017 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 11 68 13 Playground Equipment | Aug-2017 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 12 21 00 Window Blinds | Aug-2017 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | N | UFGS 12 22 00 Curtains and Drapes | Aug-2016 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2018 | A | UFGS 12 24 13 Roller Window Shades | Aug-2017 | C | 1 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |