Status
Active
Publish Date
Pages
67
Legacy Title Key
UFGS 04 20 00 Unit Masonry

Comments

Release
PA
Army
Action
Change
Change #
1

Added sentence to paragraph 2.6.2.7 in response to CCR 7025.

Release
PA
Army
Action
Change
Change #
2

Added Single-Wythe Exterior Wall CMU Flashing System, requirements for tooled joints, and note for load-bearing unit types.

Release
PA
Army
Action
Revision

Title changed from Masonry. UFGS refresh review and update

Release
PA
Army
Action
Change
Change #
3

CCR: 2299: Added provisions for telescoping bar positioners

Release
PA
Army
Action
Revision

Add Single-Wythe Masonry Wall Water Penetration Test (CCR 299)

Release
PA
Army
Action
Revision

Revised 2.17 Insulation

Release
PA
Army
Action
Revision

Updated seismic criteria

Release
PA
Army
Action
Revision

Reconciled for lost data

Release
PA
Army
Action
Revision

Combined adding NASA requirements and sustainable design requirements

Spec. Division
04 - Masonry
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
May-2019 A C 1

Added sentence to paragraph 2.6.2.7 in response to CCR 7025.

Nov-2018 A C 2

Added Single-Wythe Exterior Wall CMU Flashing System, requirements for tooled joints, and note for load-bearing unit types.

Nov-2015 A R

Title changed from Masonry. UFGS refresh review and update

Nov-2012 A C 3

CCR: 2299: Added provisions for telescoping bar positioners

Feb-2011 A R

Add Single-Wythe Masonry Wall Water Penetration Test (CCR 299)

Feb-2009 A R

Revised 2.17 Insulation

Oct-2007 A R

Updated seismic criteria

Oct-2006 A R

Reconciled for lost data

Jul-2006 A R

Combined adding NASA requirements and sustainable design requirements