Status
Active
View/Download
Publish Date
Pages
74
Legacy Title Key
UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant)
Spec. Division
33 - Utilities
CCR
History: Below is a listing of the Revisions and Changes made to this UFGS.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|
Nov-2020 | N | Nov-2018 | C | 1 |
Updated Reference Article, Submittals, and paragraphs "Contractor Qualifications" (1.5.1), "Insulating Flange Kits, (Electrically Isolating)" (2.2.8), "Flange Gaskets, Non-Electrically Isolating" (2.2.10), and "Flange Gaskets, Metallic" (2.2.11) to clarify and incorporate CCRs. |
Aug-2019 | N | Nov-2018 | C | 2 |
Updated section to include the requirements if water is used during hydrostatic testing and/or pigging. |
Nov-2018 | N | Nov-2018 | R |
Complete review and update including new Section number and title; Superseding UFGS 33 52 43 AVIATION FUEL DISTRIBUTION (NON-HYDRANT) (May-11); Preparing Activity changed from Army to Navy |
Comments
Updated Reference Article,
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:34
Updated Reference Article, Submittals, and paragraphs "Contractor Qualifications" (1.5.1), "Insulating Flange Kits, (Electrically Isolating)" (2.2.8), "Flange Gaskets, Non-Electrically Isolating" (2.2.10), and "Flange Gaskets, Metallic" (2.2.11) to clarify and incorporate CCRs.
Updated section to include
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:34
Updated section to include the requirements if water is used during hydrostatic testing and/or pigging.
Complete review and update
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:34
Complete review and update including new Section number and title; Superseding UFGS 33 52 43 AVIATION FUEL DISTRIBUTION (NON-HYDRANT) (May-11); Preparing Activity changed from Army to Navy