Status
Active
Publish Date
Pages
74
Legacy Title Key
UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant)

Comments

Release
PA
Navy
Action
Change
Change #
1

Updated Reference Article, Submittals, and paragraphs "Contractor Qualifications" (1.5.1), "Insulating Flange Kits, (Electrically Isolating)" (2.2.8), "Flange Gaskets, Non-Electrically Isolating" (2.2.10), and "Flange Gaskets, Metallic" (2.2.11) to clarify and incorporate CCRs.

Release
PA
Navy
Action
Change
Change #
2

Updated section to include the requirements if water is used during hydrostatic testing and/or pigging.

Release
PA
Navy
Action
Revision

Complete review and update including new Section number and title; Superseding UFGS 33 52 43 AVIATION FUEL DISTRIBUTION (NON-HYDRANT) (May-11); Preparing Activity changed from Army to Navy

Spec. Division
33 - Utilities
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Nov-2020 N C 1

Updated Reference Article, Submittals, and paragraphs "Contractor Qualifications" (1.5.1), "Insulating Flange Kits, (Electrically Isolating)" (2.2.8), "Flange Gaskets, Non-Electrically Isolating" (2.2.10), and "Flange Gaskets, Metallic" (2.2.11) to clarify and incorporate CCRs.

Aug-2019 N C 2

Updated section to include the requirements if water is used during hydrostatic testing and/or pigging.

Nov-2018 N R

Complete review and update including new Section number and title; Superseding UFGS 33 52 43 AVIATION FUEL DISTRIBUTION (NON-HYDRANT) (May-11); Preparing Activity changed from Army to Navy