Status
Active
Publish Date
Pages
45
Legacy Title Key
UFGS 33 40 00 Stormwater Utilities

Comments

Release
PA
Army
Action
Revision

Complete review and update including section title change from STORM DRAINAGE UTILITIES to STORMWATER UTILITIES.

Release
PA
Army
Action
Change
Change #
1

Moved the LID Verification Report to SD-11 Closeout Submittals in response to CCR 6353.

Release
PA
Army
Action
Change
Change #
2

Added requirements for field quality control.

Release
PA
Army
Action
Change
Change #
3

Replaced ASTM C 924/C924M with ASTM C969/C969M per CCR 3584.

Release
PA
Army
Action
Change
Change #
4

Made change as noted in CCR 3572; added SRPE requirements as noted in CCR 1158; made corrections and changes as noted in CCR 3333

Release
PA
Army
Action
Change
Change #
5

Added requirements for use of Polypropylene (PP) Pipe

Release
PA
Army
Action
Change
Change #
6

Per CCR 1438, changed AASHTO M 198 to ASTM C990

Release
PA
Army
Action
Revision

In response to CCR 2210, tailoring options for Pipe Materials added.

Release
PA
Army
Action
Revision

Complete revision of section

Release
PA
Army
Action
Revision

Minor corrections throughout

Release
PA
Army
Action
New

Superseding UFGS 33 40 01 Storm Drainage and UFGS 33 40 00.00 40 Storm Drainage Utilities

Spec. Division
33 - Utilities
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Nov-2021 A R

Complete review and update including section title change from STORM DRAINAGE UTILITIES to STORMWATER UTILITIES.

Feb-2019 A C 1

Moved the LID Verification Report to SD-11 Closeout Submittals in response to CCR 6353.

May-2017 A C 2

Added requirements for field quality control.

Nov-2014 A C 3

Replaced ASTM C 924/C924M with ASTM C969/C969M per CCR 3584.

Aug-2014 A C 4

Made change as noted in CCR 3572; added SRPE requirements as noted in CCR 1158; made corrections and changes as noted in CCR 3333

May-2013 A C 5

Added requirements for use of Polypropylene (PP) Pipe

Aug-2012 A C 6

Per CCR 1438, changed AASHTO M 198 to ASTM C990

Feb-2010 A R

In response to CCR 2210, tailoring options for Pipe Materials added.

Aug-2009 A R

Complete revision of section

Feb-2009 A R

Minor corrections throughout

Jan-2008 A N

Superseding UFGS 33 40 01 Storm Drainage and UFGS 33 40 00.00 40 Storm Drainage Utilities