UFGS Master Updated August 13, 2025; Posted August 21, 2025

Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Systems Command (NAVFAC), and the Air Force Civil Engineer Center (HQ AFCEC). UFGS are for use in specifying construction for the military services.

The UFGS are only published in electronic format and are intended to be used with SpecsIntact software; SpecsIntact supports the UFGS format. The UFGS Master complies with UFS 1-300-02.

Updated UFGS are posted quarterly in February, May, August, and November.

UFGS that have been unified for use by all participating agencies have a level 3 or level 4 Section number. The UFGS uses level 5 to identify a single-agency specification. The number "10" is used by USACE, "20" by NAVFAC, and "30" by AFCEC. The order of precedence for selecting UFGS sections for a project is generally:

  1. Regional UFGS if required by the contract or published on WBDG
  2. Single-agency UFGS for whom project is being developed
  3. Unified UFGS
  4. UFGS identified as specific to another DoD Service (for DoD projects only)

Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007.

The UFGS Section Template is now provided in the UFGS Master with each quarterly release and can be found under Tools in the SpecsIntact Explorer.

Questions, comments, suggestions and recommended changes for guide specifications should be submitted as a Criteria Change Request (CCR). To submit, click on the CCR link next to the document title (below). CCRs are not appropriate when they pertain to a specific project solicitation, request for proposal, or after a project award. Questions or interpretations pertaining to these documents or situations should be referred to the Contracting Officer. To view the UFGS modification classifications and examples, see the UFGS Revision-Change Policy .

Active documents are available in the following formats:   SpecsIntact (SEC) in compressed ZIP  |   Adobe Acrobat (PDF)

Archived release files are available in  Adobe Acrobat (PDF) in compressed ZIP

  Indicates the UFGS has an attachment. Click the title to view the attachment under 'Related Materials'.

? Active: Document is current, regularly maintained by the responsible DWG through formal revisions and changes, and must be used in accordance with its applicability paragraphs.

Archived: Document is outdated or superseded and not maintained. Prohibited for use in new projects. Available only for historical reference or for existing projects that previously cited the document before archival.


Title Date View CCR
UFGS MASTER [NOTE: Click/View new information under Summary]   /FFC/DOD/UFGS/UFGS_M.zip
Unified Master Reference List (UMRL)   /FFC/DOD/UMRL/UMRL.pdf
UFGS Complete   /FFC/DOD/UFGS/UFGS_COMPLETE.pdf
UFGS Master Table of Contents   /FFC/DOD/UFGS/UFGS_TOC.pdf
UFGS Revisions and Changes  
UFGS Section Template (Template CCRs Only)   CCR  
UFGS Forms, Graphics, and Tables  
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS   /FFC/DOD/UFGS/UFGS%20DIVISION%2000.zip
UFGS 00 01 15 List of Drawings   /FFC/DOD/UFGS/UFGS%2000%2001%2015.pdf|/FFC/DOD/UFGS/UFGS%2000%2001%2015.zip CCR  
DIVISION 01 - GENERAL REQUIREMENTS   /FFC/DOD/UFGS/UFGS%20DIVISION%2001.zip
UFGS 01 11 00 Summary of Work   /FFC/DOD/UFGS/UFGS%2001%2011%2000.pdf|/FFC/DOD/UFGS/UFGS%2001%2011%2000.zip CCR  
UFGS 01 14 00 Work Restrictions   /FFC/DOD/UFGS/UFGS%2001%2014%2000.pdf|/FFC/DOD/UFGS/UFGS%2001%2014%2000.zip CCR  
UFGS 01 20 00 Price and Payment Procedures   /FFC/DOD/UFGS/UFGS%2001%2020%2000.pdf|/FFC/DOD/UFGS/UFGS%2001%2020%2000.zip CCR  
UFGS 01 30 00 Administrative Requirements   /FFC/DOD/UFGS/UFGS%2001%2030%2000.pdf|/FFC/DOD/UFGS/UFGS%2001%2030%2000.zip CCR  
UFGS 01 31 20 Project Technical Data Management and Visualization   /FFC/DOD/UFGS/UFGS%2001%2031%2020.pdf|/FFC/DOD/UFGS/UFGS%2001%2031%2020.zip CCR  
UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS)   /FFC/DOD/UFGS/UFGS%2001%2031%2023.13%2020.pdf|/FFC/DOD/UFGS/UFGS%2001%2031%2023.13%2020.zip CCR  
UFGS 01 32 01.00 10 Project Schedule   /FFC/DOD/UFGS/UFGS%2001%2032%2001.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2001%2032%2001.00%2010.zip CCR  
UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS)   /FFC/DOD/UFGS/UFGS%2001%2032%2017.00%2020.pdf|/FFC/DOD/UFGS/UFGS%2001%2032%2017.00%2020.zip CCR  
UFGS 01 32 33.00 10 Photographic Documentation   /FFC/DOD/UFGS/UFGS 01 32 33.00 10.pdf|/FFC/DOD/UFGS/UFGS 01 32 33.00 10.zip CCR  
UFGS 01 33 00 Submittal Procedures   /FFC/DOD/UFGS/UFGS%2001%2033%2000.pdf|/FFC/DOD/UFGS/UFGS%2001%2033%2000.zip CCR  
UFGS 01 33 16.00 10 Design Data (Design After Award)   /FFC/DOD/UFGS/UFGS%2001%2033%2016.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2001%2033%2016.00%2010.zip CCR  
UFGS 01 33 23.33 Aviation Fuel System Specific Submittal Requirements   /FFC/DOD/UFGS/UFGS%2001%2033%2023.33.pdf|/FFC/DOD/UFGS/UFGS%2001%2033%2023.33.zip CCR  
UFGS 01 33 29 Sustainability Requirements and Reporting   /FFC/DOD/UFGS/UFGS%2001%2033%2029.pdf|/FFC/DOD/UFGS/UFGS%2001%2033%2029.zip CCR  
UFGS 01 35 13 Special Project Procedures   /FFC/DOD/UFGS/UFGS%2001%2035%2013.pdf|/FFC/DOD/UFGS/UFGS%2001%2035%2013.zip CCR  
UFGS 01 35 26 Governmental Safety Requirements   /FFC/DOD/UFGS/UFGS%2001%2035%2026.pdf|/FFC/DOD/UFGS/UFGS%2001%2035%2026.zip CCR  
UFGS 01 35 29.13 Health, Safety, and Emergency Response Procedures for Contaminated Sites   /FFC/DOD/UFGS/UFGS%2001%2035%2029.13.pdf|/FFC/DOD/UFGS/UFGS%2001%2035%2029.13.zip CCR  
UFGS 01 42 00 Sources for Reference Publications   /FFC/DOD/UFGS/UFGS%2001%2042%2000.pdf|/FFC/DOD/UFGS/UFGS%2001%2042%2000.zip CCR  
UFGS 01 42 15 Metric Measurements   /FFC/DOD/UFGS/UFGS%2001%2042%2015.pdf|/FFC/DOD/UFGS/UFGS%2001%2042%2015.zip CCR  
UFGS 01 45 00 Quality Control   /FFC/DOD/UFGS/UFGS%2001%2045%2000.pdf|/FFC/DOD/UFGS/UFGS%2001%2045%2000.zip CCR  
UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM)   /FFC/DOD/UFGS/UFGS%2001%2045%2000.15%2010.pdf|/FFC/DOD/UFGS/UFGS%2001%2045%2000.15%2010.zip CCR  
UFGS 01 45 35 Special Inspections   /FFC/DOD/UFGS/UFGS%2001%2045%2035.pdf|/FFC/DOD/UFGS/UFGS%2001%2045%2035.zip CCR  
UFGS 01 50 00 Temporary Construction Facilities and Controls   /FFC/DOD/UFGS/UFGS%2001%2050%2000.pdf|/FFC/DOD/UFGS/UFGS%2001%2050%2000.zip CCR  
UFGS 01 57 19 Temporary Environmental Controls   /FFC/DOD/UFGS/UFGS%2001%2057%2019.pdf|/FFC/DOD/UFGS/UFGS%2001%2057%2019.zip CCR  
UFGS 01 58 00 Project Identification   /FFC/DOD/UFGS/UFGS%2001%2058%2000.pdf|/FFC/DOD/UFGS/UFGS%2001%2058%2000.zip CCR  
UFGS 01 74 19 Construction Waste Management and Disposal   /FFC/DOD/UFGS/UFGS%2001%2074%2019.pdf|/FFC/DOD/UFGS/UFGS%2001%2074%2019.zip CCR  
UFGS 01 78 00 Closeout Submittals   /FFC/DOD/UFGS/UFGS%2001%2078%2000.pdf|/FFC/DOD/UFGS/UFGS%2001%2078%2000.zip CCR  
UFGS 01 78 23 Operation and Maintenance Data   /FFC/DOD/UFGS/UFGS%2001%2078%2023.pdf|/FFC/DOD/UFGS/UFGS%2001%2078%2023.zip CCR  
UFGS 01 78 23.33 Operation and Maintenance Manuals for Aviation Fuel Systems   /FFC/DOD/UFGS/UFGS%2001%2078%2023.33.pdf|/FFC/DOD/UFGS/UFGS%2001%2078%2023.33.zip CCR  
UFGS 01 78 24.00 10 Facility Data Requirements   /FFC/DOD/UFGS/UFGS%2001%2078%2024.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2001%2078%2024.00%2010.zip CCR  
UFGS 01 78 24.00 20 Facility Data Workbook (FDW)   /FFC/DOD/UFGS/UFGS%2001%2078%2024.00%2020.pdf|/FFC/DOD/UFGS/UFGS%2001%2078%2024.00%2020.zip CCR  
UFGS 01 91 00.15 Building Commissioning   /FFC/DOD/UFGS/UFGS%2001%2091%2000.15.pdf|/FFC/DOD/UFGS/UFGS%2001%2091%2000.15.zip CCR  
UFGS 01 91 19 Building Enclosure Commissioning   /FFC/DOD/UFGS/UFGS%2001%2091%2019.pdf|/FFC/DOD/UFGS/UFGS%2001%2091%2019.zip CCR  
DIVISION 02 - EXISTING CONDITIONS   /FFC/DOD/UFGS/UFGS%20DIVISION%2002.zip
UFGS 02 32 13 Subsurface Drilling and Sampling   /FFC/DOD/UFGS/UFGS%2002%2032%2013.pdf|/FFC/DOD/UFGS/UFGS%2002%2032%2013.zip CCR  
UFGS 02 41 00 [Demolition] [and] [Deconstruction]   /FFC/DOD/UFGS/UFGS%2002%2041%2000.pdf|/FFC/DOD/UFGS/UFGS%2002%2041%2000.zip CCR  
UFGS 02 42 51 Carpet Removal and Reclamation   /FFC/DOD/UFGS/UFGS%2002%2042%2051.pdf|/FFC/DOD/UFGS/UFGS%2002%2042%2051.zip CCR  
UFGS 02 42 91 Removal and Salvage of Historic Construction Materials   /FFC/DOD/UFGS/UFGS%2002%2042%2091.pdf|/FFC/DOD/UFGS/UFGS%2002%2042%2091.zip CCR  
UFGS 02 51 19 Solidification and Stabilization Decontamination   /FFC/DOD/UFGS/UFGS%2002%2051%2019.pdf|/FFC/DOD/UFGS/UFGS%2002%2051%2019.zip CCR  
UFGS 02 53 16.13 Remediation of Contaminated Soils by Thermal Desorption   /FFC/DOD/UFGS/UFGS%2002%2053%2016.13.pdf|/FFC/DOD/UFGS/UFGS%2002%2053%2016.13.zip CCR  
UFGS 02 53 16.16 In-Situ Thermal Remediation   /FFC/DOD/UFGS/UFGS%2002%2053%2016.16.pdf|/FFC/DOD/UFGS/UFGSUFGS%2002%2053%2016.16.zip CCR  
UFGS 02 54 19.13 Bioremediation Using Landfarming   /FFC/DOD/UFGS/UFGS%2002%2054%2019.13.pdf|/FFC/DOD/UFGS/UFGS%2002%2054%2019.13.zip CCR  
UFGS 02 54 19.16 Bioremediation of Soils Using Windrow Composting   /FFC/DOD/UFGS/UFGS%2002%2054%2019.16.pdf|/FFC/DOD/UFGS/UFGS%2002%2054%2019.16.zip CCR  
UFGS 02 54 23 Soil Washing Through Separation/Solubilization   /FFC/DOD/UFGS/UFGS%2002%2054%2023.pdf|/FFC/DOD/UFGS/UFGS%2002%2054%2023.zip CCR  
UFGS 02 56 13.13 Geomembrane Waste Containment   /FFC/DOD/UFGS/UFGS%2002%2056%2013.13.pdf|/FFC/DOD/UFGS/UFGS%2002%2056%2013.13.zip CCR  
UFGS 02 56 13.16 Clay Waste Containment   /FFC/DOD/UFGS/UFGS%2002%2056%2013.16.pdf|/FFC/DOD/UFGS/UFGS%2002%2056%2013.16.zip CCR  
UFGS 02 56 13.19 Geosynthetic Clay Liner Waste Containment   /FFC/DOD/UFGS/UFGS%2002%2056%2013.19.pdf|/FFC/DOD/UFGS/UFGS%2002%2056%2013.19.zip CCR  
UFGS 02 61 13 Excavation and Handling of Contaminated Material   /FFC/DOD/UFGS/UFGS%2002%2061%2013.pdf|/FFC/DOD/UFGS/UFGS%2002%2061%2013.zip CCR  
UFGS 02 61 23 Removal and Disposal of PCB Contaminated Soils   /FFC/DOD/UFGS/UFGS%2002%2061%2023.pdf|/FFC/DOD/UFGS/UFGS%2002%2061%2023.zip CCR  
UFGS 02 62 13.00 10 Air and Steam Stripping   /FFC/DOD/UFGS/UFGS%2002%2062%2013.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2002%2062%2013.00%2010.zip CCR  
UFGS 02 62 16.13 10 Operation, Maintenance and Process Monitoring for Soil Vapor Extraction (SVE) Systems   /FFC/DOD/UFGS/UFGS%2002%2062%2016.13%2010.pdf|/FFC/DOD/UFGS/UFGS%2002%2062%2016.13%2010.zip CCR  
UFGS 02 62 16.16 10 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems   /FFC/DOD/UFGS/UFGS%2002%2062%2016.16%2010.pdf|/FFC/DOD/UFGS/UFGS%2002%2062%2016.16%2010.zip CCR  
UFGS 02 65 00 Underground Storage Tank Removal   /FFC/DOD/UFGS/UFGS%2002%2065%2000.pdf|/FFC/DOD/UFGS/UFGS%2002%2065%2000.zip CCR  
UFGS 02 66 13 Select Fill and Topsoil for Landfill Cover   /FFC/DOD/UFGS/UFGS%2002%2066%2013.pdf|/FFC/DOD/UFGS/UFGS%2002%2066%2013.zip CCR  
UFGS 02 66 16 Test Fill   /FFC/DOD/UFGS/UFGS%2002%2066%2016.pdf|/FFC/DOD/UFGS/UFGS%2002%2066%2016.zip CCR  
UFGS 02 72 13.13 Point of Entry Treatment for Drinking Water   /FFC/DOD/UFGS/UFGS%2002%2072%2013.13.pdf|/FFC/DOD/UFGS/UFGS%2002%2072%2013.13.zip CCR  
UFGS 02 81 00 Transportation and Disposal of Hazardous Materials   /FFC/DOD/UFGS/UFGS%2002%2081%2000.pdf|/FFC/DOD/UFGS/UFGS%2002%2081%2000.zip CCR  
UFGS 02 82 00 Asbestos Remediation   /FFC/DOD/UFGS/UFGS%2002%2082%2000.pdf|/FFC/DOD/UFGS/UFGS%2002%2082%2000.zip CCR  
UFGS 02 83 00 Lead Remediation   /FFC/DOD/UFGS/UFGS%2002%2083%2000.pdf|/FFC/DOD/UFGS/UFGS%2002%2083%2000.zip CCR  
UFGS 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury   /FFC/DOD/UFGS/UFGS%2002%2084%2016.pdf|/FFC/DOD/UFGS/UFGS%2002%2084%2016.zip CCR  
UFGS 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs)   /FFC/DOD/UFGS/UFGS%2002%2084%2033.pdf|/FFC/DOD/UFGS/UFGS%2002%2084%2033.zip CCR  
UFGS 02 85 00 Mold Remediation   /FFC/DOD/UFGS/UFGS%2002%2085%2000.pdf|/FFC/DOD/UFGS/UFGS%2002%2085%2000.zip CCR  
DIVISION 03 - CONCRETE   /FFC/DOD/UFGS/UFGS%20DIVISION%2003.zip
UFGS 03 01 00 Rehabilitation of Concrete   /FFC/DOD/UFGS/UFGS%2003%2001%2000.pdf|/FFC/DOD/UFGS/UFGS%2003%2001%2000.zip CCR  
UFGS 03 11 19.00 Insulating Concrete Forming   /FFC/DOD/UFGS/UFGS%2003%2011%2019.00.pdf|/FFC/DOD/UFGS/UFGS%2003%2011%2019.00.zip CCR  
UFGS 03 23 00 Stressed Tendon Reinforcing   /FFC/DOD/UFGS/UFGS%2003%2023%2000.pdf|/FFC/DOD/UFGS/UFGS%2003%2023%2000.zip CCR  
UFGS 03 30 00 Cast-In-Place Concrete   /FFC/DOD/UFGS/UFGS%2003%2030%2000.pdf|/FFC/DOD/UFGS/UFGS%2003%2030%2000.zip CCR  
UFGS 03 30 53 Miscellaneous Cast-In-Place Concrete   /FFC/DOD/UFGS/UFGS%2003%2030%2053.pdf|/FFC/DOD/UFGS/UFGS%2003%2030%2053.zip CCR  
UFGS 03 31 29 Marine Concrete with Service Life Modeling   /FFC/DOD/UFGS/UFGS%2003%2031%2029.pdf|/FFC/DOD/UFGS/UFGS%2003%2031%2029.zip CCR  
UFGS 03 31 30 Marine Concrete   /FFC/DOD/UFGS/UFGS%2003%2031%2030.pdf|/FFC/DOD/UFGS/UFGS%2003%2031%2030.zip CCR  
UFGS 03 33 00 Cast-In-Place Architectural Concrete   /FFC/DOD/UFGS/UFGS%2003%2033%2000.pdf|/FFC/DOD/UFGS/UFGS%2003%2033%2000.zip CCR  
UFGS 03 37 00 Preplaced-Aggregate Concrete   /FFC/DOD/UFGS/UFGS%2003%2037%2000.pdf|/FFC/DOD/UFGS/UFGS%2003%2037%2000.zip CCR  
UFGS 03 37 13 Shotcrete   /FFC/DOD/UFGS/UFGS%2003%2037%2013.pdf|/FFC/DOD/UFGS/UFGS%2003%2037%2013.zip CCR  
UFGS 03 37 23 Roller-Compacted Concrete for Mass Concrete Construction   /FFC/DOD/UFGS/UFGS%2003%2037%2023.pdf|/FFC/DOD/UFGS/UFGS%2003%2037%2023.zip CCR  
UFGS 03 37 29 Concrete for Concrete Cutoff Walls   /FFC/DOD/UFGS/UFGS%2003%2037%2029.pdf|/FFC/DOD/UFGS/UFGS%2003%2037%2029.zip CCR  
UFGS 03 41 16.08 Precast Concrete Slabs (MAX. SPAN 8 FEET O.C.)   /FFC/DOD/UFGS/UFGS%2003%2041%2016.08.pdf|/FFC/DOD/UFGS/UFGS%2003%2041%2016.08.zip CCR  
UFGS 03 41 33 Precast Structural Pretensioned Concrete   /FFC/DOD/UFGS/UFGS%2003%2041%2033.pdf|/FFC/DOD/UFGS/UFGS%2003%2041%2033.zip CCR  
UFGS 03 42 13.00 10 Plant-Precast Concrete Products for Below Grade Construction   /FFC/DOD/UFGS/UFGS%2003%2042%2013.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2003%2042%2013.00%2010.zip CCR  
UFGS 03 44 00 Reinforced Autoclave Aerated Concrete Panels   /FFC/DOD/UFGS/UFGS%2003%2044%2000.pdf|/FFC/DOD/UFGS/UFGS%2003%2044%2000.zip CCR  
UFGS 03 45 00 Precast Architectural Concrete   /FFC/DOD/UFGS/UFGS%2003%2045%2000.pdf|/FFC/DOD/UFGS/UFGS%2003%2045%2000.zip CCR  
UFGS 03 45 33 Precast [Prestressed] Structural Concrete   /FFC/DOD/UFGS/UFGS%2003%2045%2033.pdf|/FFC/DOD/UFGS/UFGS%2003%2045%2033.zip CCR  
UFGS 03 47 13 Tilt-Up Concrete   /FFC/DOD/UFGS/UFGS%2003%2047%2013.pdf|/FFC/DOD/UFGS/UFGS%2003%2047%2013.zip CCR  
UFGS 03 51 13 Cementitious Wood Fiber Decks   /FFC/DOD/UFGS/UFGS%2003%2051%2013.pdf|/FFC/DOD/UFGS/UFGS%2003%2051%2013.zip CCR  
UFGS 03 53 14 Light Reflective Nonferrous Metallic Aggregate Floor System   /FFC/DOD/UFGS/UFGS%2003%2053%2014.pdf|/FFC/DOD/UFGS/UFGS%2003%2053%2014.zip CCR  
UFGS 03 62 16 Metallic Non-Shrink Grouting   /FFC/DOD/UFGS/UFGS%2003%2062%2016.pdf|/FFC/DOD/UFGS/UFGS%2003%2062%2016.zip CCR  
UFGS 03 70 00 Mass Concrete   /FFC/DOD/UFGS/UFGS%2003%2070%2000.pdf|/FFC/DOD/UFGS/UFGS%2003%2070%2000.zip CCR  
DIVISION 04 - MASONRY   /FFC/DOD/UFGS/UFGS%20DIVISION%2004.zip
UFGS 04 01 20.73 Masonry Strengthening Using FRP Bars   /FFC/DOD/UFGS/UFGS%2004%2001%2020.73.pdf|/FFC/DOD/UFGS/UFGS%2004%2001%2020.73.zip CCR  
UFGS 04 01 20.75 Masonry Strengthening Using Surface Applied FRP Composites   /FFC/DOD/UFGS/UFGS%2004%2001%2020.75.pdf|/FFC/DOD/UFGS/UFGS%2004%2001%2020.75.zip CCR  
UFGS 04 03 00 Conservation Treatment for Period Masonry   /FFC/DOD/UFGS/UFGS%2004%2003%2000.pdf|/FFC/DOD/UFGS/UFGS%2004%2003%2000.zip CCR  
UFGS 04 20 00 Unit Masonry   /FFC/DOD/UFGS/UFGS%2004%2020%2000.pdf|/FFC/DOD/UFGS/UFGS%2004%2020%2000.zip CCR  
UFGS 04 23 00 Glass Unit Masonry   /FFC/DOD/UFGS/UFGS%2004%2023%2000.pdf|/FFC/DOD/UFGS/UFGS%2004%2023%2000.zip CCR  
DIVISION 05 - METALS   /FFC/DOD/UFGS/UFGS%20DIVISION%2005.zip
UFGS 05 05 20 Post-Installed Concrete and Masonry Anchors   /FFC/DOD/UFGS/UFGS%2005%2005%2020.pdf|/FFC/DOD/UFGS/UFGS%2005%2005%2020.zip CCR  
UFGS 05 05 23.13 10 Ultrasonic Inspection of Weldments   /FFC/DOD/UFGS/UFGS%2005%2005%2023.13%2010.pdf|/FFC/DOD/UFGS/UFGS%2005%2005%2023.13%2010.zip CCR  
UFGS 05 05 23.16 Structural Welding   /FFC/DOD/UFGS/UFGS%2005%2005%2023.16.pdf|/FFC/DOD/UFGS/UFGS%2005%2005%2023.16.zip CCR  
UFGS 05 12 00 Structural Steel   /FFC/DOD/UFGS/UFGS%2005%2012%2000.pdf|/FFC/DOD/UFGS/UFGS%2005%2012%2000.zip CCR  
UFGS 05 14 00.13 Welding Structural Aluminum Framing   /FFC/DOD/UFGS/UFGS%2005%2014%2000.13.pdf|/FFC/DOD/UFGS/UFGS%2005%2014%2000.13.zip CCR  
UFGS 05 21 00 Steel Joist Framing   /FFC/DOD/UFGS/UFGS%2005%2021%2000.pdf|/FFC/DOD/UFGS/UFGS%2005%2021%2000.zip CCR  
UFGS 05 30 00 Steel Decks   /FFC/DOD/UFGS/UFGS%2005%2030%2000.pdf|/FFC/DOD/UFGS/UFGS%2005%2030%2000.zip CCR  
UFGS 05 40 00 Cold-Formed Metal Framing   /FFC/DOD/UFGS/UFGS%2005%2040%2000.pdf|/FFC/DOD/UFGS/UFGS%2005%2040%2000.zip CCR  
UFGS 05 50 13 Miscellaneous Metal Fabrications   /FFC/DOD/UFGS/UFGS%2005%2050%2013.pdf|/FFC/DOD/UFGS/UFGS%2005%2050%2013.zip CCR  
UFGS 05 50 14 Structural Metal Fabrications   /FFC/DOD/UFGS/UFGS%2005%2050%2014.pdf|/FFC/DOD/UFGS/UFGS%2005%2050%2014.zip CCR  
UFGS 05 50 15 Civil Works Fabrications   /FFC/DOD/UFGS/UFGS%2005%2050%2015.pdf|/FFC/DOD/UFGS/UFGS%2005%2050%2015.zip CCR  
UFGS 05 51 00 Metal Stairs   /FFC/DOD/UFGS/UFGS%2005%2051%2000.pdf|/FFC/DOD/UFGS/UFGS%2005%2051%2000.zip CCR  
UFGS 05 51 33 Metal Ladders   /FFC/DOD/UFGS/UFGS%2005%2051%2033.pdf|/FFC/DOD/UFGS/UFGS%2005%2051%2033.zip CCR  
UFGS 05 52 00 Metal Railings   /FFC/DOD/UFGS/UFGS%2005%2052%2000.pdf|/FFC/DOD/UFGS/UFGS%2005%2052%2000.zip CCR  
UFGS 05 59 10 Rolling Cover for Aviation Refueling Vaults   /FFC/DOD/UFGS/UFGS%2005%2059%2010.pdf|/FFC/DOD/UFGS/UFGS%2005%2059%2010.zip CCR  
UFGS 05 59 20 Fabrication Of Hydraulic Steel Structures   /FFC/DOD/UFGS/UFGS%2005%2059%2020.pdf|/FFC/DOD/UFGS/UFGS%2005%2059%2020.zip CCR  
UFGS 05 72 00 Decorative Metal Specialties   /FFC/DOD/UFGS/UFGS%2005%2072%2000.pdf|/FFC/DOD/UFGS/UFGS%2005%2072%2000.zip CCR  
DIVISION 06 - WOOD, PLASTICS AND COMPOSITES   /FFC/DOD/UFGS/UFGS%20DIVISION%2006.zip
UFGS 06 10 00 Rough Carpentry   /FFC/DOD/UFGS/UFGS%2006%2010%2000.pdf|/FFC/DOD/UFGS/UFGS%2006%2010%2000.zip CCR  
UFGS 06 13 33 Pier Timberwork   /FFC/DOD/UFGS/UFGS%2006%2013%2033.pdf|/FFC/DOD/UFGS/UFGS%2006%2013%2033.zip CCR  
UFGS 06 17 19 Cross-Laminated Timber   /FFC/DOD/UFGS/UFGS%2006%2017%2019.pdf|/FFC/DOD/UFGS/UFGS%2006%2017%2019.zip CCR  
UFGS 06 18 00 Glued-Laminated Construction   /FFC/DOD/UFGS/UFGS%2006%2018%2000.pdf|/FFC/DOD/UFGS/UFGS%2006%2018%2000.zip CCR  
UFGS 06 20 00 Finish Carpentry   /FFC/DOD/UFGS/UFGS%2006%2020%2000.pdf|/FFC/DOD/UFGS/UFGS%2006%2020%2000.zip CCR  
UFGS 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets   /FFC/DOD/UFGS/UFGS%2006%2041%2016.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2006%2041%2016.00%2010.zip CCR  
UFGS 06 61 16 Solid Surfacing Fabrications   /FFC/DOD/UFGS/UFGS%2006%2061%2016.pdf|/FFC/DOD/UFGS/UFGS%2006%2061%2016.zip CCR  
UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders   /FFC/DOD/UFGS/UFGS%2006%2071%2033.pdf|/FFC/DOD/UFGS/UFGS%2006%2071%2033.zip CCR  
UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating   /FFC/DOD/UFGS/UFGS%2006%2073%2001.pdf|/FFC/DOD/UFGS/UFGS%2006%2073%2001.zip CCR  
UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings   /FFC/DOD/UFGS/UFGS%2006%2082%2014.pdf|/FFC/DOD/UFGS/UFGS%2006%2082%2014.zip CCR  
DIVISION 07 - THERMAL AND MOISTURE PROTECTION   /FFC/DOD/UFGS/UFGS%20DIVISION%2007.zip
UFGS 07 11 13 Bituminous Dampproofing   /FFC/DOD/UFGS/UFGS%2007%2011%2013.pdf|/FFC/DOD/UFGS/UFGS%2007%2011%2013.zip CCR  
UFGS 07 12 00 Built-Up Bituminous Waterproofing   /FFC/DOD/UFGS/UFGS%2007%2012%2000.pdf|/FFC/DOD/UFGS/UFGS%2007%2012%2000.zip CCR  
UFGS 07 13 53 Elastomeric Sheet Waterproofing   /FFC/DOD/UFGS/UFGS%2007%2013%2053.pdf|/FFC/DOD/UFGS/UFGS%2007%2013%2053.zip CCR  
UFGS 07 14 00 Fluid-Applied Waterproofing   /FFC/DOD/UFGS/UFGS%2007%2014%2000.pdf|/FFC/DOD/UFGS/UFGS%2007%2014%2000.zip CCR  
UFGS 07 16 19 Metallic Oxide Waterproofing   /FFC/DOD/UFGS/UFGS%2007%2016%2019.pdf|/FFC/DOD/UFGS/UFGS%2007%2016%2019.zip CCR  
UFGS 07 17 00 Bentonite Waterproofing   /FFC/DOD/UFGS/UFGS%2007%2017%2000.pdf|/FFC/DOD/UFGS/UFGS%2007%2017%2000.zip CCR  
UFGS 07 18 16 Cold Liquid-Applied Reinforced Polymethyl Methacrylate Roofing   /FFC/DOD/UFGS/UFGS%2007%2018%2016.pdf|/FFC/DOD/UFGS/UFGS%2007%2018%2016.zip CCR  
UFGS 07 19 00 Water Repellents   /FFC/DOD/UFGS/UFGS%2007%2019%2000.pdf|/FFC/DOD/UFGS/UFGS%2007%2019%2000.zip CCR  
UFGS 07 21 13 Board and Block Insulation   /FFC/DOD/UFGS/UFGS%2007%2021%2013.pdf|/FFC/DOD/UFGS/UFGS%2007%2021%2013.zip CCR  
UFGS 07 21 16 Mineral Fiber Blanket Insulation   /FFC/DOD/UFGS/UFGS%2007%2021%2016.pdf|/FFC/DOD/UFGS/UFGS%2007%2021%2016.zip CCR  
UFGS 07 21 23 Loose Fill Thermal Insulation   /FFC/DOD/UFGS/UFGS%2007%2021%2023.pdf|/FFC/DOD/UFGS/UFGS%2007%2021%2023.zip CCR  
UFGS 07 22 00 Roof and Deck Insulation   /FFC/DOD/UFGS/UFGS%2007%2022%2000.pdf|/FFC/DOD/UFGS/UFGS%2007%2022%2000.zip CCR  
UFGS 07 24 00 Exterior Insulation and Finish Systems   /FFC/DOD/UFGS/UFGS%2007%2024%2000.pdf|/FFC/DOD/UFGS/UFGS%2007%2024%2000.zip CCR  
UFGS 07 27 10 Building Air Barrier System   /FFC/DOD/UFGS/UFGS%2007%2027%2010.pdf|/FFC/DOD/UFGS/UFGS%2007%2027%2010.zip CCR  
UFGS 07 27 19.01 Self-Adhering Air Barriers   /FFC/DOD/UFGS/UFGS%2007%2027%2019.01.pdf|/FFC/DOD/UFGS/UFGS%2007%2027%2019.01.zip CCR  
UFGS 07 27 26 Fluid-Applied Membrane Barriers   /FFC/DOD/UFGS/UFGS%2007%2027%2026.pdf|/FFC/DOD/UFGS/UFGS%2007%2027%2026.zip CCR  
UFGS 07 27 36 Spray Foam Air Barriers   /FFC/DOD/UFGS/UFGS%2007%2027%2036.pdf|/FFC/DOD/UFGS/UFGS%2007%2027%2036.zip CCR  
UFGS 07 31 13 Asphalt Shingles   /FFC/DOD/UFGS/UFGS%2007%2031%2013.pdf|/FFC/DOD/UFGS/UFGS%2007%2031%2013.zip CCR  
UFGS 07 31 26 Slate Shingles   /FFC/DOD/UFGS/UFGS%2007%2031%2026.pdf|/FFC/DOD/UFGS/UFGS%2007%2031%2026.zip CCR