Status
Active
Publish Date
Pages
27
Legacy Title Key
UFGS 07 61 15.00 20 Aluminum Standing Seam Roofing

Comments

Release
PA
Navy
Action
Change
Change #
1

Added note for use of coated alclad in ESC C3-C5 locations.

Release
PA
Navy
Action
Change
Change #
2

Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

Release
PA
Navy
Action
Revision

Alignment with Federal and DoD sustainability requirements for tracking and reporting

Release
PA
Navy
Action
Revision

Reference updates: modified subparts 1.3.2.1 (notes) and 2.5.3

Release
PA
Navy
Action
New

Reinstated for NAVFAC use

Spec. Division
07 - Thermal and Moisture Protection
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Nov-2018 N C 1

Added note for use of coated alclad in ESC C3-C5 locations.

Aug-2018 N C 2

Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

Aug-2016 N R

Alignment with Federal and DoD sustainability requirements for tracking and reporting

May-2011 N R

Reference updates: modified subparts 1.3.2.1 (notes) and 2.5.3

Aug-2008 N N

Reinstated for NAVFAC use

Jan-2008 N D

Superseded by UFGS 07 41 13 Metal Roof Panels
Note: The last published PDF version of this Section is available in the previous release in the <a href="https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-uf… Archives</a>.