The preparing activity (PA)
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Administrative Change: Preparing Activity changed from NASA to Army.
Incorporation of the
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Incorporation of the following CCRs: Incorporated PPI Information CCR# 7812 - Changed Title to Certification of Submittal in 1.17 CCR# 7894 - Updated paragraph 1.6.1 for non-Army projects CCR# 8991 - Added 23 09 00 to paragraph 1.5.2 CCR# 9026 - Deleted the 2nd sentence in par 1.10.2. Added “For variations that include design changes or some material or product substitutions, the Government may require an evaluation and analysis by a licensed professional engineer hired by the contractor. in para 1.10.1 CCR# 9065 - Deleted Tailoring Notes for 1.4.2.1, 1.4.2.2, 1.4.2.3 and 1.4.2.4. Added note to 1.4.2 CCR# 9073 - Added Section 01 91 00.15 20: Commissioning Plan, Certificate of Readiness, and Commissioning Report" to paragraph 1.5.2 CCR# 9326
Editing Para 1.17
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Editing Para 1.17
In response to CCR's 7173,
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
In response to CCR's 7173, 7174, 7175, 7176, 7177, and 7123.
02/28/19 INTERIM RELEASE: This section was updated in response to CCR's 7314 and 7315 - the banner was incorrectly marked and was corrected to indicate Change 2; the command Execute Revisions was run to eliminate formatting elements that displayed in the previous version.
Submittal Note updated and
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Submittal Note updated and tailoring changes.
Tri-Annual Database
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling.
Updated to coordinate
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Updated to coordinate archiving of Navy Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a "Department-wide, Open Protocol, Energy Monitoring and Utility Control System Specification" for use in military construction and military family housing activities.: Changed MSDS to SDS
Replaced UFGS 01 45 00.10 10
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Replaced 01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS) with 01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) in Subpart 1.9 SUBMITTAL REGISTER AND DATABASE.
Revised the following three
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Revised the following three subparts, 1.4.1, 1.4.3, 1.11.4, due to releasing Section 01 33 16.00 10 DESIGN DATA [DESIGN AFTER AWARDS] for use on USACE Design-Build projects only.
Incorporated outstanding CCR
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Incorporated outstanding CCR's.
Subpart 1.2.1, under SD-11,
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Subpart 1.2.1, under SD-11, deleted the mention of DD Form 1354; Subpart 1.4.7, corrected typo, changed tittle to Sustainability Reporting Submittals (S), revised the 1st and 2nd paragraph ; added Sub[art 1.6.10, 1.6.10.1 and 1.6.11; Subpart 1.11.1, revised paragraph; added paragraph "j." to Subpart 1.11.3; Subpart 1.13, added the word "Contract" prior to the word clause, entitled "Changes.".
Per USACE request, adjusted
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Per USACE request, adjusted the Note in the following subparts, 1.4.1, 1.4.3, 1.11.4, to let the designers know they can only use the wording in the Model RFP for guidance but can't get the file, Section 01 33 16 Design After Award is not a UFGS Section.
Tri-Annual Database
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Tri-Annual Database Maintenance (TADM), which consists of: Tailoring changes, incorporation of Sustainability requirements, CCR's and verification of all reports and spelling.
Section 26 12 19.20 was
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Section 26 12 19.20 was replaced by 26 12 21 SINGLE-PHASED PAD- MOUNTED TRANSFORMERS at Subpart 1.5.1.2
In the last paragraph of the
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
In the last paragraph of the General Note, changed CONSTRUCTION to DESIGN-BID-BUILD within the Army tailoring tag
Per Action Item 41, inserted
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Per Action Item 41, inserted a Note into subparts 1.4.1, 1.4.3, 1.11.4, where users can obtain the Section 01 33 16; Replace the CONSTRUCTION tailoring option tag with DESIGN-BID- BUILD in subparts 1.1, 1.2.1, 1.4.2, 1.4.6, 1.10.4.1, 1.14, 1.16
CCR 808: Inserted 1.1 SUMMARY
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
CCR 808: Inserted 1.1 SUMMARY inside of an Army tailoring tag
Revised subpart 1.9.4; added
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Revised subpart 1.9.4; added subpart 1.9.4.1, 1.9.4.2; minor revisions
throughout; tailoring tags were corrected; CCR #82 / CCR #340 - comments
were incorporated
INTERIM RELEASE: added
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
INTERIM RELEASE: added tailoring for "Construction" in subpart 1.1.1 under SD-01; added tailoring option for "Army" in subpart 1.1.3; other minor revisions in subparts 1.3.5, 1.8, 1.8.1, 1.8.2, and 1.8.3
Revised subpart 1.5.4 and 1.5
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Revised subpart 1.5.4 and 1.5.9; revised note in 1.8.2 and 1.9; minor revision in article 1.14
Minor Revisions
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Minor revisions
Updated Standard Submittal
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Updated Standard Submittal Note
Edits from USACE
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Edits from USACE
Updated Criteria; Preparing
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Updated Criteria; Preparing Activity changed to NASA
Deleted unnecessary reference
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Deleted unnecessary reference.
Added sustainable design
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:25
Added sustainable design requirements