UFGS Master Updated August 13, 2025; Posted August 21, 2025
Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Systems Command (NAVFAC), and the Air Force Civil Engineer Center (HQ AFCEC). UFGS are for use in specifying construction for the military services.
The UFGS are only published in electronic format and are intended to be used with SpecsIntact software; SpecsIntact supports the UFGS format. The UFGS Master complies with UFS 1-300-02.
Updated UFGS are posted quarterly in February, May, August, and November.
UFGS that have been unified for use by all participating agencies have a level 3 or level 4 Section number. The UFGS uses level 5 to identify a single-agency specification. The number "10" is used by USACE, "20" by NAVFAC, and "30" by AFCEC. The order of precedence for selecting UFGS sections for a project is generally:
- Regional UFGS if required by the contract or published on WBDG
- Single-agency UFGS for whom project is being developed
- Unified UFGS
- UFGS identified as specific to another DoD Service (for DoD projects only)
Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007.
The UFGS Section Template is now provided in the UFGS Master with each quarterly release and can be found under Tools in the SpecsIntact Explorer.
Questions, comments, suggestions and recommended changes for guide specifications should be submitted as a Criteria Change Request (CCR). To submit, click on the CCR link next to the document title (below). CCRs are not appropriate when they pertain to a specific project solicitation, request for proposal, or after a project award. Questions or interpretations pertaining to these documents or situations should be referred to the Contracting Officer. To view the UFGS modification classifications and examples, see the UFGS Revision-Change Policy .
Active documents are available in the following formats: SpecsIntact (SEC) in compressed ZIP | Adobe Acrobat (PDF)
Archived release files are available in Adobe Acrobat (PDF) in compressed ZIP
Indicates the UFGS has an attachment. Click the title to view the attachment under 'Related Materials'.
Title | Date | View | CCR |
---|---|---|---|
UFGS 33 11 00 Water Utility Distribution Piping | /FFC/DOD/UFGS/UFGS%2033%2011%2000.pdf|/FFC/DOD/UFGS/UFGS%2033%2011%2000.zip | CCR | |
UFGS 33 11 13 Potable Water Supply Wells | /FFC/DOD/UFGS/UFGS%2033%2011%2013.pdf|/FFC/DOD/UFGS/UFGS%2033%2011%2013.zip | CCR | |
UFGS 33 11 23 Natural Gas and Liquid Petroleum Piping | /FFC/DOD/UFGS/UFGS%2033%2011%2023.pdf|/FFC/DOD/UFGS/UFGS%2033%2011%2023.zip | CCR | |
UFGS 33 16 13.16 Wire-Wound Circular Prestressed-Concrete Water Tank | /FFC/DOD/UFGS/UFGS%2033%2016%2013.16.pdf|/FFC/DOD/UFGS/UFGS%2033%2016%2013.16.zip | CCR | |
UFGS 33 16 15 Water Storage Steel Tanks | /FFC/DOD/UFGS/UFGS%2033%2016%2015.pdf|/FFC/DOD/UFGS/UFGS%2033%2016%2015.zip | CCR | |
UFGS 33 26 00.00 10 Relief Wells | /FFC/DOD/UFGS/UFGS%2033%2026%2000.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2033%2026%2000.00%2010.zip | CCR | |
UFGS 33 30 00 Sanitary Sewerage | /FFC/DOD/UFGS/UFGS%2033%2030%2000.pdf|/FFC/DOD/UFGS/UFGS%2033%2030%2000.zip | CCR | |
UFGS 33 31 23.00 10 Sanitary Sewer Force Main Piping | /FFC/DOD/UFGS/UFGS%2033%2031%2023.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2033%2031%2023.00%2010.zip | CCR | |
UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations | /FFC/DOD/UFGS/UFGS%2033%2032%2016.pdf|/FFC/DOD/UFGS/UFGS%2033%2032%2016.zip | CCR | |
UFGS 33 34 56.00 10 Drainage Field Dosing Chambers | /FFC/DOD/UFGS/UFGS%2033%2034%2056.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2033%2034%2056.00%2010.zip | CCR | |
UFGS 33 40 00 Stormwater Utilities | /FFC/DOD/UFGS/UFGS%2033%2040%2000.pdf|/FFC/DOD/UFGS/UFGS%2033%2040%2000.zip | CCR | |
UFGS 33 46 16 Subdrainage Piping | /FFC/DOD/UFGS/UFGS%2033%2046%2016.pdf|/FFC/DOD/UFGS/UFGS%2033%2046%2016.zip | CCR | |
UFGS 33 47 13 Pond and Reservoir Liners | /FFC/DOD/UFGS/UFGS%2033%2047%2013.pdf|/FFC/DOD/UFGS/UFGS%2033%2047%2013.zip | CCR | |
UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines | /FFC/DOD/UFGS/UFGS%2033%2051%2015.pdf|/FFC/DOD/UFGS/UFGS%2033%2051%2015.zip | CCR | |
UFGS 33 51 39 Monitoring Wells | /FFC/DOD/UFGS/UFGS%2033%2051%2039.pdf|/FFC/DOD/UFGS/UFGS%2033%2051%2039.zip | CCR | |
UFGS 33 51 43 Instrumentation and Performance Monitoring of Structures | /FFC/DOD/UFGS/UFGS%2033%2051%2043.pdf|/FFC/DOD/UFGS/UFGS%2033%2051%2043.zip | CCR | |
UFGS 33 52 10 Fuel Systems Piping (Service Station) | /FFC/DOD/UFGS/UFGS%2033%2052%2010.pdf|/FFC/DOD/UFGS/UFGS%2033%2052%2010.zip | CCR | |
UFGS 33 52 23.15 POL Service Piping Welding | /FFC/DOD/UFGS/UFGS%2033%2052%2023.15.pdf|/FFC/DOD/UFGS/UFGS%2033%2052%2023.15.zip | CCR | |
UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant) | /FFC/DOD/UFGS/UFGS%2033%2052%2040.pdf|/FFC/DOD/UFGS/UFGS%2033%2052%2040.zip | CCR | |
UFGS 33 52 43.11 Aviation Fuel Mechanical Equipment | /FFC/DOD/UFGS/UFGS%2033%2052%2043.11.pdf|/FFC/DOD/UFGS/UFGS%2033%2052%2043.11.zip | CCR | |
UFGS 33 52 43.12 Aviation Fuel Pantographs | /FFC/DOD/UFGS/UFGS%2033%2052%2043.12.pdf|/FFC/DOD/UFGS/UFGS%2033%2052%2043.12.zip | CCR | |
UFGS 33 52 43.13 Aviation Fuel Piping | /FFC/DOD/UFGS/UFGS%2033%2052%2043.13.pdf|/FFC/DOD/UFGS/UFGS%2033%2052%2043.13.zip | CCR | |
UFGS 33 52 43.14 Aviation Fuel Control Valves | /FFC/DOD/UFGS/UFGS%2033%2052%2043.14.pdf|/FFC/DOD/UFGS/UFGS%2033%2052%2043.14.zip | CCR | |
UFGS 33 52 43.23 Aviation Fuel Pumps | /FFC/DOD/UFGS/UFGS%2033%2052%2043.23.pdf|/FFC/DOD/UFGS/UFGS%2033%2052%2043.23.zip | CCR | |
UFGS 33 52 43.28 Filter Separator, Aviation Fueling System | /FFC/DOD/UFGS/UFGS%2033%2052%2043.28.pdf|/FFC/DOD/UFGS/UFGS%2033%2052%2043.28.zip | CCR | |
UFGS 33 52 80 Liquid Fuels Pipeline Coating Systems | /FFC/DOD/UFGS/UFGS%2033%2052%2080.pdf|/FFC/DOD/UFGS/UFGS%2033%2052%2080.zip | CCR | |
UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks | /FFC/DOD/UFGS/UFGS%2033%2056%2010.pdf|/FFC/DOD/UFGS/UFGS%2033%2056%2010.zip | CCR | |
UFGS 33 56 19 Fuel Impermeable Liner System | /FFC/DOD/UFGS/UFGS%2033%2056%2019.pdf|/FFC/DOD/UFGS/UFGS%2033%2056%2019.zip | CCR | |
UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank | /FFC/DOD/UFGS/UFGS%2033%2056%2021.17.pdf|/FFC/DOD/UFGS/UFGS%2033%2056%2021.17.zip | CCR | |
UFGS 33 56 21.18 Single Wall POL Tank Undertank Interstitial Space | /FFC/DOD/UFGS/UFGS%2033%2056%2021.18.pdf|/FFC/DOD/UFGS/UFGS%2033%2056%2021.18.zip | CCR | |
UFGS 33 57 55 Fuel Systems Components (Non-Hydrant) | /FFC/DOD/UFGS/UFGS%2033%2057%2055.pdf|/FFC/DOD/UFGS/UFGS%2033%2057%2055.zip | CCR | |
UFGS 33 60 02 Aboveground Heat Distribution System | /FFC/DOD/UFGS/UFGS%2033%2060%2002.pdf|/FFC/DOD/UFGS/UFGS%2033%2060%2002.zip | CCR | |
UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System | /FFC/DOD/UFGS/UFGS%2033%2061%2013.pdf|/FFC/DOD/UFGS/UFGS%2033%2061%2013.zip | CCR | |
UFGS 33 61 13.13 Prefabricated Underground Hydronic Energy Distribution | /FFC/DOD/UFGS/UFGS%2033%2061%2013.13.pdf|/FFC/DOD/UFGS/UFGS%2033%2061%2013.13.zip | CCR | |
UFGS 33 61 13.19 Valves, Piping, and Equipment in Valve Manholes | /FFC/DOD/UFGS/UFGS%2033%2061%2013.19.pdf|/FFC/DOD/UFGS/UFGS%2033%2061%2013.19.zip | CCR | |
UFGS 33 61 14 Exterior Buried Preinsulated Water Piping | /FFC/DOD/UFGS/UFGS%2033%2061%2014.pdf|/FFC/DOD/UFGS/UFGS%2033%2061%2014.zip | CCR | |
UFGS 33 63 13 Exterior Underground Steam Distribution System | /FFC/DOD/UFGS/UFGS%2033%2063%2013.pdf|/FFC/DOD/UFGS/UFGS%2033%2063%2013.zip | CCR | |
UFGS 33 63 13.19 Concrete Trench Hydronic and Steam Energy Distribution | /FFC/DOD/UFGS/UFGS%2033%2063%2013.19.pdf|/FFC/DOD/UFGS/UFGS%2033%2063%2013.19.zip | CCR | |
UFGS 33 63 14 Exterior Buried Pumped Condensate Return | /FFC/DOD/UFGS/UFGS%2033%2063%2014.pdf|/FFC/DOD/UFGS/UFGS%2033%2063%2014.zip | CCR | |
UFGS 33 63 16 Exterior Shallow Trench Steam Distribution | /FFC/DOD/UFGS/UFGS%2033%2063%2016.pdf|/FFC/DOD/UFGS/UFGS%2033%2063%2016.zip | CCR | |
UFGS 33 63 23 Exterior Aboveground Steam Distribution | /FFC/DOD/UFGS/UFGS%2033%2063%2023.pdf|/FFC/DOD/UFGS/UFGS%2033%2063%2023.zip | CCR | |
UFGS 33 71 01 Overhead Transmission and Distribution | /FFC/DOD/UFGS/UFGS%2033%2071%2001.pdf|/FFC/DOD/UFGS/UFGS%2033%2071%2001.zip | CCR | |
UFGS 33 71 02 Underground Electrical Distribution | /FFC/DOD/UFGS/UFGS%2033%2071%2002.pdf|/FFC/DOD/UFGS/UFGS%2033%2071%2002.zip | CCR | |
UFGS 33 82 00 Telecommunications Outside Plant (OSP) | /FFC/DOD/UFGS/UFGS%2033%2082%2000.pdf|/FFC/DOD/UFGS/UFGS%2033%2082%2000.zip | CCR | |
DIVISION 34 - TRANSPORTATION | /FFC/DOD/UFGS/UFGS%20DIVISION%2034.zip | ||
UFGS 34 11 00 Railroad Track and Accessories | /FFC/DOD/UFGS/UFGS%2034%2011%2000.pdf|/FFC/DOD/UFGS/UFGS%2034%2011%2000.zip | CCR | |
UFGS 34 11 19.00 20 Welding Crane and Railroad Rail - Thermite Method | /FFC/DOD/UFGS/UFGS%2034%2011%2019.00%2020.pdf|/FFC/DOD/UFGS/UFGS%2034%2011%2019.00%2020.zip | CCR | |
UFGS 34 60 13 Electric Vehicle Charging Facility (EVCF) | /FFC/DOD/UFGS/UFGS%2034%2060%2013.pdf|/FFC/DOD/UFGS/UFGS%2034%2060%2013.zip | CCR | |
UFGS 34 71 13.16 Vehicle Crash Barriers | /FFC/DOD/UFGS/UFGS%2034%2071%2013.16.pdf|/FFC/DOD/UFGS/UFGS%2034%2071%2013.16.zip | CCR | |
UFGS 34 73 13 Aircraft Tiedowns | /FFC/DOD/UFGS/UFGS%2034%2073%2013.pdf|/FFC/DOD/UFGS/UFGS%2034%2073%2013.zip | CCR | |
UFGS 34 73 16 Airfield Grounding | /FFC/DOD/UFGS/UFGS%2034%2073%2016.pdf|/FFC/DOD/UFGS/UFGS%2034%2073%2016.zip | CCR | |
UFGS 34 75 13.13 Crash Rated Active Vehicle Barriers And Controls | /FFC/DOD/UFGS/UFGS%2034%2075%2013.13.pdf|/FFC/DOD/UFGS/UFGS%2034%2075%2013.13.zip | CCR | |
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION | /FFC/DOD/UFGS/UFGS%20DIVISION%2035.zip | ||
UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams | /FFC/DOD/UFGS/UFGS%2035%2001%2041.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2035%2001%2041.00%2010.zip | CCR | |
UFGS 35 01 70.13 Wire Rope for Gate Operating Devices | /FFC/DOD/UFGS/UFGS%2035%2001%2070.13.pdf|/FFC/DOD/UFGS/UFGS%2035%2001%2070.13.zip | CCR | |
UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures | /FFC/DOD/UFGS/UFGS%2035%2005%2040.14%2010.pdf|/FFC/DOD/UFGS/UFGS%2035%2005%2040.14%2010.zip | CCR | |
UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly | /FFC/DOD/UFGS/UFGS%2035%2005%2040.17.pdf|/FFC/DOD/UFGS/UFGS%2035%2005%2040.17.zip | CCR | |
UFGS 35 20 14 Stoplogs | /FFC/DOD/UFGS/UFGS%2035%2020%2014.pdf|/FFC/DOD/UFGS/UFGS%2035%2020%2014.zip | CCR | |
UFGS 35 20 15 FRP Composites for Low-Head Water Control Structures | /FFC/DOD/UFGS/UFGS%2035%2020%2015.pdf|/FFC/DOD/UFGS/UFGS%2035%2020%2015.zip | CCR | |
UFGS 35 20 16.33 Hydraulic Miter Gates | /FFC/DOD/UFGS/UFGS%2035%2020%2016.33.pdf|/FFC/DOD/UFGS/UFGS%2035%2020%2016.33.zip | CCR | |
UFGS 35 20 16.39 Hydraulic Sector Gates | /FFC/DOD/UFGS/UFGS%2035%2020%2016.39.pdf|/FFC/DOD/UFGS/UFGS%2035%2020%2016.39.zip | CCR | |
UFGS 35 20 16.46 Hydraulic Tainter Gates and Anchorages | /FFC/DOD/UFGS/UFGS%2035%2020%2016.46.pdf|/FFC/DOD/UFGS/UFGS%2035%2020%2016.46.zip | CCR | |
UFGS 35 20 16.53 Hydraulic Vertical Lift Gates | /FFC/DOD/UFGS/UFGS%2035%2020%2016.53.pdf|/FFC/DOD/UFGS/UFGS%2035%2020%2016.53.zip | CCR | |
UFGS 35 20 16.54 Slide Gates and Actuators | /FFC/DOD/UFGS/UFGS%2035%2020%2016.54.pdf|/FFC/DOD/UFGS/UFGS%2035%2020%2016.54.zip | CCR | |
UFGS 35 20 16.59 Closure Gates | /FFC/DOD/UFGS/UFGS%2035%2020%2016.59.pdf|/FFC/DOD/UFGS/UFGS%2035%2020%2016.59.zip | CCR | |
UFGS 35 20 20 Electrical Equipment for Gate Hoist | /FFC/DOD/UFGS/UFGS%2035%2020%2020.pdf|/FFC/DOD/UFGS/UFGS%2035%2020%2020.zip | CCR | |
UFGS 35 20 23 Dredging | /FFC/DOD/UFGS/UFGS%2035%2020%2023.pdf|/FFC/DOD/UFGS/UFGS%2035%2020%2023.zip | CCR | |
UFGS 35 20 23.13 National Dredging Quality Management Program - Scow [Monitoring][ and ][Ullage] Profile | /FFC/DOD/UFGS/UFGS%2035%2020%2023.13.pdf|/FFC/DOD/UFGS/UFGS%2035%2020%2023.13.zip | CCR | |
UFGS 35 20 23.23 National Dredging Quality Management Program - Hopper Dredge | /FFC/DOD/UFGS/UFGS%2035%2020%2023.23.pdf|/FFC/DOD/UFGS/UFGS%2035%2020%2023.23.zip | CCR | |
UFGS 35 20 23.33 National Dredging Quality Management Program - Pipeline Hydraulic Dredge | /FFC/DOD/UFGS/UFGS%2035%2020%2023.33.pdf|/FFC/DOD/UFGS/UFGS%2035%2020%2023.33.zip | CCR | |
UFGS 35 31 19.20 Articulating Concrete Block Revetments | /FFC/DOD/UFGS/UFGS%2035%2031%2019.20.pdf|/FFC/DOD/UFGS/UFGS%2035%2031%2019.20.zip | CCR | |
UFGS 35 31 19.40 Stone Revetments | /FFC/DOD/UFGS/UFGS%2035%2031%2019.40.pdf|/FFC/DOD/UFGS/UFGS%2035%2031%2019.40.zip | CCR | |
UFGS 35 41 00 Levee Construction | /FFC/DOD/UFGS/UFGS%2035%2041%2000.pdf|/FFC/DOD/UFGS/UFGS%2035%2041%2000.zip | CCR | |
UFGS 35 42 34 Reinforced Soil Slope | /FFC/DOD/UFGS/UFGS%2035%2042%2034.pdf|/FFC/DOD/UFGS/UFGS%2035%2042%2034.zip | CCR | |
UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type | /FFC/DOD/UFGS/UFGS%2035%2045%2001.pdf|/FFC/DOD/UFGS/UFGS%2035%2045%2001.zip | CCR | |
UFGS 35 45 02.00 10 Submersible Pump, Axial-Flow and Mixed-Flow Type | /FFC/DOD/UFGS/UFGS%2035%2045%2002.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2035%2045%2002.00%2010.zip | CCR | |
UFGS 35 45 03.00 10 Speed Reducers for Storm Water Pumps | /FFC/DOD/UFGS/UFGS%2035%2045%2003.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2035%2045%2003.00%2010.zip | CCR | |
UFGS 35 45 04.00 10 Submersible Pump, Centrifugal Type | /FFC/DOD/UFGS/UFGS%2035%2045%2004.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2035%2045%2004.00%2010.zip | CCR | |
UFGS 35 51 13.00 20 Concrete Floating Pier for Small Craft | /FFC/DOD/UFGS/UFGS%2035%2051%2013.00%2020.pdf|/FFC/DOD/UFGS/UFGS%2035%2051%2013.00%2020.zip | CCR | |
UFGS 35 59 13.13 Prestressed Concrete Fender Piling | /FFC/DOD/UFGS/UFGS%2035%2059%2013.13.pdf|/FFC/DOD/UFGS/UFGS%2035%2059%2013.13.zip | CCR | |
UFGS 35 59 13.14 20 Polymeric Piles | /FFC/DOD/UFGS/UFGS%2035%2059%2013.14%2020.pdf|/FFC/DOD/UFGS/UFGS%2035%2059%2013.14%2020.zip | CCR | |
UFGS 35 59 13.16 Extruded and Molded Marine Fenders | /FFC/DOD/UFGS/UFGS%2035%2059%2013.16.pdf|/FFC/DOD/UFGS/UFGS%2035%2059%2013.16.zip | CCR | |
UFGS 35 59 13.17 Foam-Filled Marine Fenders | /FFC/DOD/UFGS/UFGS%2035%2059%2013.17.pdf|/FFC/DOD/UFGS/UFGS%2035%2059%2013.17.zip | CCR | |
UFGS 35 59 13.18 Pneumatic and Hydro-Pneumatic Marine Fenders | /FFC/DOD/UFGS/UFGS%2035%2059%2013.18.pdf|/FFC/DOD/UFGS/UFGS%2035%2059%2013.18.zip | CCR | |
UFGS 35 73 13 Embankment for Earth and Rockfill Dams | /FFC/DOD/UFGS/UFGS%2035%2073%2013.pdf|/FFC/DOD/UFGS/UFGS%2035%2073%2013.zip | CCR | |
DIVISION 40 - PROCESS INTEGRATION | /FFC/DOD/UFGS/UFGS%20DIVISION%2040.zip | ||
UFGS 40 05 13 Pipelines, Liquid Process Piping | /FFC/DOD/UFGS/UFGS%2040%2005%2013.pdf|/FFC/DOD/UFGS/UFGS%2040%2005%2013.zip | CCR | |
UFGS 40 05 13.96 Welding Process Piping | /FFC/DOD/UFGS/UFGS%2040%2005%2013.96.pdf|/FFC/DOD/UFGS/UFGS%2040%2005%2013.96.zip | CCR | |
UFGS 40 17 26.00 20 Welding Pressure Piping | /FFC/DOD/UFGS/UFGS%2040%2017%2026.00%2020.pdf|/FFC/DOD/UFGS/UFGS%2040%2017%2026.00%2020.zip | CCR | |
UFGS 40 60 00 Process Control | /FFC/DOD/UFGS/UFGS%2040%2060%2000.pdf|/FFC/DOD/UFGS/UFGS%2040%2060%2000.zip | CCR | |
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT | /FFC/DOD/UFGS/UFGS%20DIVISION%2041.zip | ||
UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running | /FFC/DOD/UFGS/UFGS%2041%2022%2013.14.pdf|/FFC/DOD/UFGS/UFGS%2041%2022%2013.14.zip | CCR | |
UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley | /FFC/DOD/UFGS/UFGS%2041%2022%2013.15.pdf|/FFC/DOD/UFGS/UFGS%2041%2022%2013.15.zip | CCR | |
UFGS 41 22 13.16 Gantry Cranes | /FFC/DOD/UFGS/UFGS%2041%2022%2013.16.pdf|/FFC/DOD/UFGS/UFGS%2041%2022%2013.16.zip | CCR | |
UFGS 41 22 13.19 Jib Cranes | /FFC/DOD/UFGS/UFGS 41 22 13.19.pdf|/FFC/DOD/UFGS/UFGS 41 22 13.19.zip | CCR | |
UFGS 41 22 13.33 Portal Crane Track Installation | /FFC/DOD/UFGS/UFGS%2041%2022%2013.33.pdf|/FFC/DOD/UFGS/UFGS%2041%2022%2013.33.zip | CCR | |
UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar | /FFC/DOD/UFGS/UFGS%2041%2022%2013.55.pdf|/FFC/DOD/UFGS/UFGS%2041%2022%2013.55.zip | CCR | |
UFGS 41 22 23.19 Monorail Hoists | /FFC/DOD/UFGS/UFGS%2041%2022%2023.19.pdf|/FFC/DOD/UFGS/UFGS%2041%2022%2023.19.zip | CCR | |
UFGS 41 36 30.00 10 Ultrasonic Inspection of Plates | /FFC/DOD/UFGS/UFGS%2041%2036%2030.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2041%2036%2030.00%2010.zip | CCR | |
UFGS 41 65 10.00 10 [Diesel] [Natural Gas] Fueled Engine Pump Drives | /FFC/DOD/UFGS/UFGS%2041%2065%2010.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2041%2065%2010.00%2010.zip | CCR | |
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT | /FFC/DOD/UFGS/UFGS%20DIVISION%2043.zip | ||
UFGS 43 15 00.00 20 Low Pressure Compressed Air Piping (Non-Breathing Air Type) | /FFC/DOD/UFGS/UFGS%2043%2015%2000.00%2020.pdf|/FFC/DOD/UFGS/UFGS%2043%2015%2000.00%2020.zip | CCR | |
UFGS 43 21 29 Flow Measuring Equipment (Potable Water) (Sewage Treatment Plant) | /FFC/DOD/UFGS/UFGS%2043%2021%2029.pdf|/FFC/DOD/UFGS/UFGS%2043%2021%2029.zip | CCR | |
UFGS 43 31 13.13 10 Activated Carbon-Gas and Liquid Purification Filters | /FFC/DOD/UFGS/UFGS%2043%2031%2013.13%2010.pdf|/FFC/DOD/UFGS/UFGS%2043%2031%2013.13%2010.zip | CCR | |
DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT | /FFC/DOD/UFGS/UFGS%20DIVISION%2044.zip | ||
UFGS 44 10 00 Air Pollution Control | /FFC/DOD/UFGS/UFGS%2044%2010%2000.pdf|/FFC/DOD/UFGS/UFGS%2044%2010%2000.zip | CCR | |
UFGS 44 41 00 Water Pollution Containment And Cleanup Equipment | /FFC/DOD/UFGS/UFGS%2044%2041%2000.pdf|/FFC/DOD/UFGS/UFGS%2044%2041%2000.zip | CCR | |
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT | /FFC/DOD/UFGS/UFGS%20DIVISION%2046.zip | ||
UFGS 46 07 13.13 Precipitation/Coagulation/Flocculation (P/C/F) Water Treatment | /FFC/DOD/UFGS/UFGS%2046%2007%2013.13.pdf|/FFC/DOD/UFGS/UFGS%2046%2007%2013.13.zip | CCR | |
UFGS 46 07 53 Packaged Wastewater Treatment Equipment | /FFC/DOD/UFGS/UFGS%2046%2007%2053.pdf|/FFC/DOD/UFGS/UFGS%2046%2007%2053.zip | CCR | |
UFGS 46 20 20 Sewage Bar Screen and Mechanical Shredder | /FFC/DOD/UFGS/UFGS%2046%2020%2020.pdf|/FFC/DOD/UFGS/UFGS%2046%2020%2020.zip | CCR | |
UFGS 46 23 00 Grit Removal and Handling Equipment | /FFC/DOD/UFGS/UFGS%2046%2023%2000.pdf|/FFC/DOD/UFGS/UFGS%2046%2023%2000.zip | CCR | |
UFGS 46 24 16 Comminutors | /FFC/DOD/UFGS/UFGS%2046%2024%2016.pdf|/FFC/DOD/UFGS/UFGS%2046%2024%2016.zip | CCR | |
UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators | /FFC/DOD/UFGS/UFGS%2046%2025%2014.pdf|/FFC/DOD/UFGS/UFGS%2046%2025%2014.zip | CCR | |
UFGS 46 30 00 Water and Wastewater Chemical Feed Systems | /FFC/DOD/UFGS/UFGS%2046%2030%2000.pdf|/FFC/DOD/UFGS/UFGS%2046%2030%2000.zip | CCR | |
UFGS 46 30 13 Advanced Oxidation Processes (AOP) | /FFC/DOD/UFGS/UFGS%2046%2030%2013.pdf|/FFC/DOD/UFGS/UFGS%2046%2030%2013.zip | CCR | |
UFGS 46 31 11 Chlorine Gas Feed Equipment | /FFC/DOD/UFGS/UFGS%2046%2031%2011.pdf|/FFC/DOD/UFGS/UFGS%2046%2031%2011.zip | CCR | |
UFGS 46 43 21 Circular Clarifier Equipment | /FFC/DOD/UFGS/UFGS%2046%2043%2021.pdf|/FFC/DOD/UFGS/UFGS%2046%2043%2021.zip | CCR | |
UFGS 46 51 00.00 10 Air and Gas Diffusion System | /FFC/DOD/UFGS/UFGS%2046%2051%2000.00%2010.pdf|/FFC/DOD/UFGS/UFGS%2046%2051%2000.00%2010.zip | CCR | |
UFGS 46 53 22 Trickling Filter | /FFC/DOD/UFGS/UFGS%2046%2053%2022.pdf|/FFC/DOD/UFGS/UFGS%2046%2053%2022.zip | CCR | |
UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System | /FFC/DOD/UFGS/UFGS%2046%2053%2062.pdf|/FFC/DOD/UFGS/UFGS%2046%2053%2062.zip | CCR | |
UFGS 46 61 00 Filtration Equipment | /FFC/DOD/UFGS/UFGS%2046%2061%2000.pdf|/FFC/DOD/UFGS/UFGS%2046%2061%2000.zip | CCR | |
UFGS 46 66 56 Open-Channel Disinfection Equipment | /FFC/DOD/UFGS/UFGS%2046%2066%2056.pdf|/FFC/DOD/UFGS/UFGS%2046%2066%2056.zip | CCR | |
UFGS 46 71 16 Gravity Belt Thickeners | /FFC/DOD/UFGS/UFGS%2046%2071%2016.pdf|/FFC/DOD/UFGS/UFGS%2046%2071%2016.zip | CCR | |
DIVISION 48 - ELECTRICAL POWER GENERATION | /FFC/DOD/UFGS/UFGS%20DIVISION%2048.zip | ||
UFGS 48 06 15 Turbine Oil | /FFC/DOD/UFGS/UFGS%2048%2006%2015.pdf|/FFC/DOD/UFGS/UFGS%2048%2006%2015.zip | CCR | |
UFGS 48 14 00 Solar Photovoltaic Systems | /FFC/DOD/UFGS/UFGS%2048%2014%2000.pdf|/FFC/DOD/UFGS/UFGS%2048%2014%2000.zip | CCR | |
UFGS 48 15 00 Wind Generator System | /FFC/DOD/UFGS/UFGS%2048%2015%2000.pdf|/FFC/DOD/UFGS/UFGS%2048%2015%2000.zip | CCR | |
UFGS 48 16 00 Landfill Gas Systems | /FFC/DOD/UFGS/UFGS%2048%2016%2000.pdf|/FFC/DOD/UFGS/UFGS%2048%2016%2000.zip | CCR |