Status
Active
View/Download
Publish Date
Pages
56
Legacy Title Key
UFGS 33 71 02 Underground Electrical Distribution
Spec. Division
33 - Utilities
CCR
Comments
Complete review. Revised to
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:34
Complete review. Revised to incorporate CCRs.
Incorporated dispersal of
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:34
Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, therefore, the following language was removed from the paragraph Cable Marking (2.2.6) “, or approved equal,”.
The UFGS has been revised
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:34
The UFGS has been revised through-out. Modifications include updates to references and clarifications of requirements and applications of materials and methods relating to: conduits, conductors, certificates, faulted circuit indicators, fireproofing, handholes, grounding, and duct-banks.
Changed Section Reference 31
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:34
Changed Section Reference 31 31 16 SOIL TREATMENT FOR
SUBTERRANEAN TERMITE CONTROL to Section Reference 31 31 16.13 CHEMICAL TERMITE CONTROL
New; supersedes 33 71 02.00
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:34
New; Superseding UFGS 33 71 02.00 20 Underground Electrical Distribution and UFGS 33 70 02.00 10 Electrical Distribution System, Underground