Aug-2008
|
S
|
UFGS 23 82 46 Electric Unit Heaters
|
Aug-2008
|
N
|
|
Superseding UFGS 40 41 13.13 40 Process Piping Electrical Resistance Heat Tracing
|
Aug-2008
|
S
|
UFGS 26 05 00 Common Work Results for Electrical
|
Aug-2008
|
N
|
|
Renumbered; Superseding UFGS 26 05 00.00 40 with same title; Minor Edits
|
Aug-2008
|
S
|
UFGS 26 05 00.00 40 Common Work Results for Electrical
|
Apr-2008
|
D
|
|
Renumbered/ Superseded by UFGS 26 05 00 with same title
|
Aug-2008
|
S
|
UFGS 26 05 13.00 10 Medium-Voltage Cables
|
Aug-2008
|
R
|
|
Revised throughout
|
Aug-2008
|
S
|
UFGS 26 05 73.00 40 Overcurrent Protective Devices
|
Aug-2008
|
R
|
|
Section References (SRF) update
|
Aug-2008
|
N
|
UFGS 26 08 00 Apparatus Inspection and Testing
|
Aug-2008
|
R
|
|
Deleted reference to L-16303, changed Transmission Distribution to Electrical Distribution
|
Aug-2008
|
S
|
UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters
|
Aug-2008
|
R
|
|
Minor Edits
|
Aug-2008
|
N
|
UFGS 26 20 00 Interior Distribution System
|
Aug-2008
|
R
|
|
Deleted reference to L-16303 and note, changed Transmission Distribution to Electrical Distribution
|
Aug-2008
|
S
|
UFGS 26 26 00.00 40 Power Distribution Units
|
Aug-2008
|
R
|
|
Section References (SRF) update
|
Aug-2008
|
S
|
UFGS 26 27 26.00 40 Wiring Devices
|
Jul-2007
|
D
|
|
Redundant to UFGS 26 05 00 Common Work Results for Electrical
|
Aug-2008
|
S
|
UFGS 26 28 16.00 40 Enclosed Switches and Circuit Breakers
|
Jul-2007
|
D
|
|
Superseded by UFGS 26 28 21.00 40 Automatic Transfer Switches
|
Aug-2008
|
S
|
UFGS 26 28 21.00 40 Automatic Transfer Switches
|
Aug-2008
|
N
|
|
Superseding UFGS 26 28 16.00 40 Enclosed Switches and Circuit Breakers; Minor Edits
|
Aug-2008
|
S
|
UFGS 26 35 33 Power Factor Correction Equipment
|
Apr-2008
|
D
|
|
Renumbered/ Superseded by UFGS 26 35 33.00 40 with same title
|
Aug-2008
|
S
|
UFGS 26 35 33.00 40 Power Factor Correction Equipment
|
Aug-2008
|
N
|
|
Renumbered; Superseding UFGS 26 35 33 with same title
|
Aug-2008
|
S
|
UFGS 26 51 13.09 40 Fluorescent Luminaries
|
Apr-2007
|
D
|
|
Superseded by UFGS 26 51 00 Interior Lighting (Preparing Activity NAVFAC)
|
Aug-2008
|
S
|
UFGS 26 53 00 Exit Signs
|
Aug-2008
|
N
|
|
Renumbered; Superseding UFGS 26 53 00.00 40 with same title
|
Aug-2008
|
S
|
UFGS 26 53 00.00 40 Exit Signs
|
Jan-2007
|
D
|
|
Renumbered/ Superseded by UFGS 26 53 00 with same title
|
Aug-2008
|
S
|
UFGS 26 54 00.00 40 Classified, Special Purpose, Exterior Lighting
|
Jul-2007
|
D
|
|
Section no longer required; Information is covered in other UFGS sections
|
Aug-2008
|
S
|
UFGS 26 60 13 Low-Voltage Motors
|
Jul-2007
|
D
|
|
NASA reclassified this as fifth level; Renumbered/ Superseded by UFGS 26 60 13.00 40 with no title change
|
Aug-2008
|
S
|
UFGS 26 60 13.00 40 Low-Voltage Motors
|
Aug-2008
|
N
|
|
Renumbered; Superseding UFGS 26 60 13 with same title
|
Aug-2008
|
S
|
UFGS 27 05 28.36 40 Cable Trays for Communications Systems
|
Jul-2007
|
D
|
|
Renumbered/ Superseded by UFGS 27 05 28.36 with same title
|
Aug-2008
|
S
|
UFGS 27 05 28.36 Cable Trays for Communications Systems
|
Aug-2008
|
N
|
|
Renumbered; Superseding UFGS 27 05 28.36 40 with same title; Minor Edits
|
Aug-2008
|
N
|
UFGS 27 31 00.00 20 Administrative Telephone Equipment, Inside Plant
|
Apr-2006
|
D
|
|
Deleted with no superseding section
|
Aug-2008
|
S
|
UFGS 28 05 26 Grounding and Bonding for Electronic Safety and Security
|
Jan-2008
|
D
|
|
Superseded by reinstated NASA section UFGS 28 05 26.00 40 with same title
|
Aug-2008
|
S
|
UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems
|
Aug-2008
|
N
|
|
Reinstated NASA section; Renumbered/ Superseding UFGS 28 05 26 with same title; Section References (SRF) update
|
Aug-2008
|
S
|
UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm
|
Aug-2008
|
R
|
|
Minor Edits
|
Aug-2008
|
A
|
UFGS 31 00 00 Earthwork
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 31 05 19 Geotextile
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 31 05 20 Geosynthetic Drainage Layer
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 31 05 21 Geogrid Soil Reinforcement
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 31 05 22 Geotextiles Used as Filters
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 31 10 00 Site Clearing
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 31 11 00 Clearing and Grubbing
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 31 21 00 Off-Gassing Mitigation
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 31 31 16 Soil Treatment for Subterranean Termite Control
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 31 31 16.21 Mesh Termite Barrier
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 31 32 11 Soil Surface Erosion Control
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 31 32 23 Foundation Drilling and Grouting
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 31 32 39 Bioengineering Practices for Stream Bank and Shoreline Stabilization
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 31 36 00 Gabions
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 31 63 26 Drilled Caissons
|
Aug-2008
|
N
|
|
Superseding UFGS 31 63 26.00 10 Drilled Foundation Caissons (Piers) and UFGS 31 63 26.16 20 Drilled Foundation Caissons
|
Aug-2008
|
A
|
UFGS 31 63 26.00 10 Drilled Foundation Caissons (Piers)
|
Oct-2007
|
D
|
|
Superseded by UFGS 31 63 26 Drilled Caissons
|
Aug-2008
|
N
|
UFGS 31 63 26.16 20 Drilled Foundation Caissons
|
Apr-2006
|
D
|
|
Superseded by UFGS 31 63 26 Drilled Caissons
|
Aug-2008
|
A
|
UFGS 32 01 11.52 Runway Rubber Removal
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 01 13 Bituminous Seal and Fog Coats
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 01 16.17 Cold Milling of Bituminous Pavements
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 01 17 Cold-Mix Recycling
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 01 17.16 Sealing of Cracks in Bituminous Pavements
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 01 19 Field Molded Sealants for Sealing Joints in Rigid Pavements
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 01 22 Bituminous Rejuvenation
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 01 24 Hot In-Place Recycling of Bituminous Pavements
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 01 25 Heater Scarifying of Bituminous Pavements
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 01 26.71 Grooving for Airfield Pavements
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 01 29.62 Concrete Pavement Raising
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
N
|
UFGS 32 10 00 [Pervious] Bituminous Concrete Pavement
|
Aug-2008
|
R
|
|
Section References (SRF) update
|
Aug-2008
|
A
|
UFGS 32 11 10 Drainage Layer
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 11 16 [Base Course for Rigid] [ and ] [Subbases for Flexible] Paving
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 11 23 [Aggregate Base Course] [and][or] [Graded Crushed Aggregate Base Course] for Flexible Paving
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
N
|
UFGS 32 11 24 Graded Crushed Aggregate Base Course for [Pervious] [Flexible] Pavement
|
Aug-2008
|
R
|
|
Section References (SRF) update
|
Aug-2008
|
A
|
UFGS 32 11 26 Hot-Mix Bituminous Base Course for Roads and Streets
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 11 27 Bituminous-Stabilized Base Course, Subbase, or Subgrade
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 11 29 Lime-[Stabilized] [Modified] Subgrade
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
N
|
UFGS 32 11 30 Lime Treated Subgrade [Lime Modified Soils]
|
Aug-2008
|
R
|
|
Minor revisions throughout
|
Aug-2008
|
N
|
UFGS 32 11 33 Cement Stabilized [Base] [Subbase] Course at Airfields and Roads
|
Aug-2008
|
R
|
|
Minor revisions throughout
|
Aug-2008
|
A
|
UFGS 32 11 34 Portland Cement-Stabilized Base or Subbase Course
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 12 10 Bituminous Tack and Prime Coats
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 12 11 Bituminous Surface Treatment
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 12 16 Hot-Mix Asphalt (HMA) for Roads
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 12 18 Resin Modified Pavement Surfacing Material
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 12 19 Bituminous Binder and Wearing Courses (Central-Plant Cold-Mix)
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 12 20 Porous Friction Course for Airfields and Roads
|
Apr-2006
|
D
|
|
Superseded by UFGS 32 12 43.16 with no title change
|
Aug-2008
|
A
|
UFGS 32 12 21 Bituminous Road-Mix Surface Course
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 12 22.00 10 Polymer Concrete-Micro-Overlay (PCMO) For Fuel and Abrasion Resistant Wearing Surfaces
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 12 37 Fuel-Resistant (Coal Tar) Sealer
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
A
|
UFGS 32 12 43.16 Porous Friction Course for Airfields and Roads
|
Aug-2008
|
N
|
|
Superseding UFGS 32 12 20 with same title.
|
Aug-2008
|
N
|
UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities
|
Aug-2008
|
R
|
|
Minor revisions throughout
|
Aug-2008
|
A
|
UFGS 32 13 17 Stone Matrix Asphalt (SMA) for Airfield Pavements
|
Aug-2008
|
R
|
|
Compliance with CSI SectionFormat
|
Aug-2008
|
N
|
UFGS 33 05 16 Concrete Poles
|
Aug-2008
|
R
|
|
Section References (SRF) update
|
Aug-2008
|
N
|
UFGS 33 11 23 Natural Gas and Liquid Petroleum Piping
|
Aug-2008
|
N
|
|
Renumbered; Superseding UFGS 33 11 23.00 20 with same title
|
Aug-2008
|
N
|
UFGS 33 11 23.00 20 Natural Gas and Liquid Petroleum Piping
|
Apr-2006
|
D
|
|
Superseded; Renumbered as UFGS 33 11 23 with no title change
|
Aug-2008
|
F
|
UFGS 33 12 33.00 30 Water Meters
|
Aug-2008
|
N
|
|
New Section
|
Aug-2008
|
A
|
UFGS 33 24 13 Groundwater Monitoring Wells
|
Aug-2008
|
R
|
|
Revisions throughout during unification/disassembly of UFGS for MF04 compliance; Title changed from Ground-Water Monitoring Wells
|
Aug-2008
|
N
|
UFGS 33 52 90.00 20 Welding for POL Service Piping
|
Aug-2008
|
R
|
|
Deleted Table I; Mandatory Minimum Nondestructive Examinations (subpara. i) and tags; Deleted last sentence (subpara j); Deleted Note in 3.2 and Table in 3.2 i
|
Aug-2008
|
N
|
UFGS 33 71 02.00 20 Underground Electrical Distribution
|
Aug-2008
|
R
|
|
Changed Transmission and Distribution to Electrical Distribution and corrected URL for graphics
|
Aug-2008
|
S
|
UFGS 33 71 39.13 40 Overhead High-Voltage Wiring
|
Jan-2007
|
D
|
|
Redundant to UFGS 33 71 01 Overhead Transmission and Distribution (Preparing Activity NAVFAC)
|
Aug-2008
|
S
|
UFGS 33 73 00.00 40 Utility Transformers
|
Aug-2008
|
R
|
|
Minor Edits
|
Aug-2008
|
S
|
UFGS 33 75 00.00 40 Switchgear and Protection Devices
|
Aug-2008
|
R
|
|
Minor Edits; Title changed from High-Voltage Switchgear and Protection Devices
|
Aug-2008
|
S
|
UFGS 33 77 19.00 40 Medium-Voltage Switch
|
Aug-2008
|
R
|
|
Minor Edits; Title changed from Gas Medium-Voltage Circuit Breaker
|
Aug-2008
|
S
|
UFGS 33 77 36 Medium-Voltage Utility Fuses
|
Apr-2008
|
D
|
|
Renumbered/ Superseded by UFGS 33 77 36.00 40 with same title
|
Aug-2008
|
S
|
UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses
|
Aug-2008
|
N
|
|
Section reinstated and renumbered; Superseding UFGS 33 77 36 with same title
|
Aug-2008
|
N
|
UFGS 34 43 00.00 20 Airfield Lighting
|
Aug-2008
|
R
|
|
Deleted reference to L-16303 and Note; changed Transmission Distribution to Electrical Distribution; added Part 3.12
|
Aug-2008
|
N
|
UFGS 35 59 13.14 20 Polymeric Piles
|
Aug-2008
|
R
|
|
Added option for warranty length
|
Aug-2008
|
N
|
UFGS 35 59 13.16 Extruded and Molded Marine Fenders
|
Aug-2008
|
R
|
|
Corrected Submittal (SUB) tags
|
Aug-2008
|
S
|
UFGS 40 18 00 Vacuum Systems Process Piping
|
Aug-2008
|
R
|
|
Section References (SRF) update
|
Aug-2008
|
S
|
UFGS 40 41 13.13 40 Process Piping Electrical Resistance Heat Tracing
|
Jan-2007
|
D
|
|
Superseded by UFGS 23 82 46 Electric Unit Heaters
|
Aug-2008
|
N
|
UFGS 41 22 03.13 20 Monorails with Manual Hoists
|
Apr-2006
|
D
|
|
Superseded by UFGS 41 22 23.19 Monorail Hoists and UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running
|
Aug-2008
|
N
|
UFGS 41 22 03.16 20 Monorails with Air Motor Powered Hoists
|
Apr-2006
|
D
|
|
Superseded by UFGS 41 22 23.19 Monorail Hoists
|
Aug-2008
|
S
|
UFGS 42 22 00.00 40 Process Chillers and Coolers
|
Aug-2008
|
R
|
|
Section References (SRF) update
|
Aug-2008
|
S
|
UFGS 42 22 13 Centrifugal Process Chillers and Coolers
|
Aug-2008
|
N
|
|
Renumbered/ Superseding UFGS 42 22 13.00 40 with same title
|
Aug-2008
|
S
|
UFGS 42 22 13.00 40 Centrifugal Process Chillers and Coolers
|
Apr-2008
|
D
|
|
Renumbered/ Superseded by UFGS 42 22 13 with no title change
|