Status
Active
Publish Date
Pages
15
Legacy Title Key
UFGS 07 27 19.01 Self-Adhering Air Barriers

Comments

Release
PA
Navy
Action
Change

In response to CCR 13571, corrected the air leakage rate in list item b. Assembly Air Leakage, under Physical Properties paragraph (2.1.1)

Release
PA
Navy
Action
Revision

Complete review and update including the incorporation of CCRs.

Release
PA
Navy
Action
Change

In response to CCR 8741, "Qualifications of Manufacturer" and "Qualification of Installer" were removed from SD-07 in the Submittal Article since both are already listed under SD-01.

Release
PA
Navy
Action
Change

Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

Release
PA
Navy
Action
New

New specifications for vapor permeable and vapor retarding self-adhering air barrier systems as part of building enclosure system. Use this section in conjunction with Section 07 27 10.00 10, BUILDING AIR BARRIER SYSTEM and Section 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS.

Spec. Division
07 - Thermal and Moisture Protection
CCR