Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Nov-2009 N UFGS 22 16 19.26 20 Large Centrifugal Air Compressors (Over 200 HP) R Removed paragraph 1.2 regarding Y2K
Nov-2009 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems R Revised Duct Test Holes and Cleaning and Adjusting in response to CCR's
Nov-2009 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems R Revised firestopping to close a CCR
Nov-2009 N UFGS 23 22 26.00 20 Steam System and Terminal Units R Removed paragraph 1.2.4.5 regarding Y2K
Nov-2009 N UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment R Removed paragraph 1.2 regarding Y2K; Section References (SRF) update
Nov-2009 N UFGS 26 12 19 Pad-Mounted, Liquid-Filled, Medium Voltage Transformers R Major revision
Nov-2009 N UFGS 28 31 02.00 20 Fire Alarm Reporting Systems - Digital Communicators R Removed paragraph 1.4 regarding Y2K
Nov-2009 A UFGS 32 11 29 Lime-[Stabilized] [Modified] Subgrade R Revisions throughout including, but not limited to, Pneumatic-Tired Rollers, Submittals, Mix Design, Installation, Sampling and Testing, Field Quality Control
Nov-2009 A UFGS 32 13 11 Concrete Pavement for Airfields and Other Heavy-Duty Pavements R Revisions throughout including, but not limited to, Test Section, Portland Cement, aggregate blending, other finishing equipment and broom finish
Nov-2009 N UFGS 32 84 24 Irrigation Sprinkler Systems R Removed paragraph 1.2 regarding Y2K and paragraph 1.9
Nov-2009 N UFGS 33 11 00 Water Utility Distribution Piping R Section References (SRF) update
Nov-2009 N UFGS 33 11 23 Natural Gas and Liquid Petroleum Piping R Removed paragraph 1.2 regarding Y2K, removed Y2K info from SD-07 Certificates and paragraphs 1.7 and 2.1 including note in between
Nov-2009 N UFGS 33 52 43.00 20 Aviation Fuel Distribution and Dispensing R Removed paragraph 1.2.1 regarding Y2K
Nov-2009 N UFGS 33 52 90.00 20 Welding for POL Service Piping R Section References (SRF) update: references to sections 15899 and 13004 have been replaced with UFGS 33 52 43.30 and UFGS 33 08 55 respectively
Nov-2009 N UFGS 44 42 13.00 20 Aeration Equipment R Removed paragraph 1.2 regarding Y2K; Section References (SRF) update
Nov-2009 N UFGS 44 42 23 Circular Clarifier R Removed paragraph 1.2 regarding Y2K, SD-07 Certificates, and paragraph 1.8
Nov-2009 N UFGS 44 42 39 Grit Collecting Equipment R Removed paragraph 1.3 regarding Y2K and SD-07 Certificates
Aug-2009 N INACTIVE-UFGS 09 97 13.15 Low VOC Polysulfide Interior Coating of Welded Steel Petroleum Fuel Tanks R Section References (SRF) update
Aug-2009 N UFGS 01 20 00.00 20 Price and Payment Procedures R Updated the last criteria NOTE (Costloaded NAS) in the introduction; updated paras 1.3, 1.5,1.6, 1.7.2.
Aug-2009 N UFGS 01 35 26 Governmental Safety Requirements R Major revision
Aug-2009 A UFGS 01 50 00 Temporary Construction Facilities and Controls R Revised USACE Project Sign requirements
Aug-2009 N UFGS 01 58 00 Project Identification R Minor revisions
Aug-2009 N UFGS 03 31 29 Marine Concrete with Service Life Modeling R Major revision
Aug-2009 A UFGS 05 21 13 Deep Longspan Steel Joist Framing R Extensive reformat for conformance with CSI SectionFormat
Aug-2009 A UFGS 05 21 16 Longspan Steel Joist Framing R Extensive reformat for conformance with CSI SectionFormat
Aug-2009 A UFGS 05 59 13 Fabrication of Hydraulic Steel Structures N New section
Aug-2009 A UFGS 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets R Compliance with CSI SectionFormat
Aug-2009 A UFGS 06 61 16 Solid Surfacing Fabrications R Compliance with CSI SectionFormat
Aug-2009 A UFGS 07 31 26 Slate Shingles R Compliance with CSI SectionFormat
Aug-2009 A UFGS 07 55 00 Protected Membrane Roofing (PMR) R Compliance with CSI SectionFormat
Aug-2009 N UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing R Minor revisions
Aug-2009 A UFGS 07 61 01 Copper Roof System R Compliance with CSI SectionFormat
Aug-2009 A UFGS 07 62 10 Copper Sheet Metal Flashing R Compliance with CSI SectionFormat
Aug-2009 A UFGS 07 72 00 Roof Ventilators, Gravity-Type R Compliance with CSI SectionFormat
Aug-2009 A UFGS 08 34 01 Forced Entry Resistant Components R Compliance with CSI SectionFormat
Aug-2009 A UFGS 08 34 02 Bullet-Resistant Components R Compliance with CSI SectionFormat
Aug-2009 A UFGS 08 39 54 Blast Resistant Doors R Compliance with CSI SectionFormat
Aug-2009 N UFGS 08 51 13 Aluminum Windows R Major revision
Aug-2009 A UFGS 08 52 70 Wood Windows - Repair and Rehabilitation R Compliance with CSI SectionFormat
Aug-2009 A UFGS 08 62 00 Skylights R Compliance with CSI SectionFormat
Aug-2009 A UFGS 08 87 16 Fragment Retention Film for Glass R Compliance with CSI SectionFormat
Aug-2009 N UFGS 09 22 00 Supports for Plaster and Gypsum Board R Minor revisions
Aug-2009 N UFGS 09 29 00 Gypsum Board R Minor revisions
Aug-2009 N UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System R Section References (SRF) update
Aug-2009 N UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System R Section References (SRF) update
Aug-2009 S UFGS 09 90 00.00 40 Painting and Coating D Section merged with UFGS 09 90 00 Paints and Coatings (Preparing Activity: NAVFAC)
Note: The last published PDF version of this Section is available in the previous release in the <a href="https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-uf… Archives</a>.
Aug-2009 N UFGS 09 97 13.16 Interior Coating of Welded Steel Water Tanks R Section References (SRF) update
Aug-2009 N UFGS 09 97 13.17 Three Coat Epoxy Interior Coating of Welded Steel Petroleum Fuel Tanks R Section References (SRF) update
Aug-2009 N UFGS 09 97 13.25 Maintenance, Repair, and Coating of Tall Antenna Towers R Section References (SRF) update
Aug-2009 N UFGS 09 97 13.27 High Performance Coating for Steel Structures R Section References (SRF) update
Aug-2009 N UFGS 09 97 13.28 Protection of Buried Steel Piping and Steel Bulkhead Tie Rods R Section References (SRF) update
Aug-2009 A UFGS 11 13 10 Dock Levelers R Revised SD-10 Operation and Maintenance Data
Aug-2009 N UFGS 22 00 00 Plumbing, General Purpose R Subpart 1.2-Corrected lead para; 2.4.3-added Dual Flush; 2.5-added Regulatory Agencies; 2.10-modified para. & editorial corrections; 2.10.4-updated para. and subpart as, 3.9.1.1-updated para.; 3.9.5-updated para.
Aug-2009 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems R Corrections and revision throughout, plus addition of Navy tailoring
Aug-2009 N UFGS 23 05 93 Testing, Adjusting, and Balancing for HVAC R For NAVFAC projects: added notes under Project Drawings and Dalt Procedures, modified para 1.2, 3.4.1, 3.4.8, and 3.7
Aug-2009 N UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC R Within subpart 2.3.1, deleted third paragraph
Aug-2009 S UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC R Minor revisions
Aug-2009 S UFGS 23 22 25 Steam Valves R Minor revisions
Aug-2009 N UFGS 23 64 00 Packaged Water Chillers, Absorption Type R Deleted para. 2.5.5
Aug-2009 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems R Editorial changes to subparts 2.3 & 2.4
Aug-2009 A UFGS 26 42 14.00 10 Cathodic Protection System (Sacrificial Anode) R Incorporated CCRs 1174, 1175, 1178, 1181, 1184, and 1185
Aug-2009 A UFGS 28 31 64.00 10 Fire Detection and Alarm System, Addressable R Incorporated CCRs 1499, 1500, 1501, 1502, 1503, 1504, 1505, 1506, 1507, 1509, and 1510
Aug-2009 A UFGS 31 41 16 Metal Sheet Piling R Revised sheet piling section properties
Aug-2009 N UFGS 31 62 13.20 Precast/Prestressed Concrete Piles R Major revision
Aug-2009 A UFGS 32 12 16 Hot-Mix Asphalt (HMA) for Roads R Revised JMF requirements and Tables 7 and 8 revised; changed text to active voice
Aug-2009 A UFGS 33 40 00 Stormwater Utilities R Complete revision of section
Aug-2009 N UFGS 33 52 80 Liquid Fuels Pipeline Coating Systems R Section References (SRF) update
Aug-2009 A UFGS 33 82 01 Intercommunication System R Revised SD-10 Operation and Maintenance Data
Aug-2009 N UFGS 35 59 13.13 Prestressed Concrete Fender Piling R Major revision
May-2009 A UFGS 01 42 00 Sources for Reference Publications R National Association of Architectural Metal Manufacturers (NAAMM) address correction
May-2009 A UFGS 01 78 00 Closeout Submittals R Clarified CADD file format
May-2009 S UFGS 02 42 51 Carpet Removal and Reclamation N New section
May-2009 A UFGS 03 11 13.00 10 Structural Cast-In-Place Concrete Forming R Combined section with UFGS 03 11 14.00 10 Formwork for Concrete
May-2009 A UFGS 03 11 14.00 10 Formwork for Concrete D Section has been combined with and superseded by UFGS 03 11 13.00 10 Structural Concrete Formwork
Note: The last published PDF version of this Section is available in the previous release in the <a href="https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-uf… Archives</a>.
May-2009 S UFGS 03 62 16 Metallic Non-Shrink Grouting R General update
May-2009 S UFGS 05 51 00 Metal Stairs R General update
May-2009 S UFGS 05 72 00 Decorative Metal Specialties R General update
May-2009 S UFGS 06 18 00 Glued-Laminated Construction R General update
May-2009 S UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders N New section
May-2009 S UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings N New section
May-2009 S UFGS 07 41 63 Fabricated Roof Panel Assemblies R General update
May-2009 A UFGS 08 13 73 Sliding Metal Doors R Compliance with CSI SectionFormat
May-2009 S UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames N New section
May-2009 A UFGS 08 33 13 Coiling Counter Doors R Compliance with CSI SectionFormat
May-2009 A UFGS 09 06 90 Schedules for Painting and Coating R Compliance with CSI SectionFormat
May-2009 A UFGS 09 24 23 Cement Stucco R Compliance with CSI SectionFormat
May-2009 A UFGS 09 35 16 Chemical-Resistant Quarry Tiling R Compliance with CSI SectionFormat
May-2009 A UFGS 09 64 23 Wood Parquet Flooring R Compliance with CSI SectionFormat
May-2009 A UFGS 09 65 33 Conductive Vinyl Flooring R Compliance with CSI SectionFormat
May-2009 A UFGS 09 65 66 Resilient Athletic Flooring R Compliance with CSI SectionFormat
May-2009 A UFGS 09 66 13 Portland Cement Terrazzo Flooring R Compliance with CSI SectionFormat
May-2009 A UFGS 09 66 16 Terrazzo Floor Tile R Compliance with CSI SectionFormat
May-2009 A UFGS 09 66 23 Resinous Matrix Terrazzo Flooring R Compliance with CSI SectionFormat
May-2009 A UFGS 09 83 13 Acoustical Wall Coating R Compliance with CSI SectionFormat
May-2009 A UFGS 09 97 01.00 10 Metallizing Hydraulic Structures R Compliance with CSI SectionFormat
May-2009 A UFGS 09 97 02 Painting: Hydraulic Structures R Compliance with CSI SectionFormat
May-2009 A UFGS 09 97 30 Preparation of Historic Wood and Metal Surfaces for Painting R Compliance with CSI SectionFormat
May-2009 A UFGS 10 22 19 Demountable and Moveable Partitions R Compliance with CSI SectionFormat
May-2009 A UFGS 10 26 13 Wall and Corner Guards R Compliance with CSI SectionFormat
May-2009 S UFGS 10 44 16 Fire Extinguishers R General update