Status
Active
Publish Date
Pages
18
Legacy Title Key
UFGS 08 11 13 Steel Doors and Frames

Comments

Release
PA
Navy
Action
Revision

This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.

Release
PA
Navy
Action
Change
Change #
1

Added note for door louvers and exterior screens in humid or ESC C3-C5 locations.

Release
PA
Navy
Action
Change
Change #
2

Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

Release
PA
Navy
Action
Change
Change #
3

Modified subpart 2.3

Release
PA
Navy
Action
Revision

Section References (SRF) update and minor revisions

Release
PA
Navy
Action
Revision

Added ATFP requirements for Door Glazing

Release
PA
Navy
Action
Revision

Added NASA requirements

Spec. Division
08 - Openings
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2020 N R

This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.

Nov-2018 N C 1

Added note for door louvers and exterior screens in humid or ESC C3-C5 locations.

Aug-2018 N C 2

Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

Feb-2014 N C 3

Modified subpart 2.3

Feb-2010 N R

Section References (SRF) update and minor revisions

Aug-2008 N R

Added ATFP requirements for Door Glazing

Jul-2006 N R