Status
Retired / Superseded
Publish Date
Archived / Rescinded Date
Change Notice

<p>Superseded by UFGS 23 11 20 FACILITY GAS PIPING without revision to comply with MF 2011 in response to CCR 2027.</p>

Legacy Title Key
UFGS 23 11 25 Facility Gas Piping

Comments

Release
PA
Army
Action
Change
Change #
1

Updated requirements for natural gas compliance with 49 CFR 192.

Release
PA
Army
Action
Change
Change #
2

Added CSST, Gas Shut-off, Pressure Regulator, Bolting Gasket and Identification requirements

Release
PA
Army
Action
New

Superseding UFGS 23 11 23.00 10 Gas Piping System and UFGS 23 11 23.00 40 Facility Natural-Gas Piping

Spec. Division
23 - Heating, Ventilating, and Air Conditioning

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
May-2020 A D

Superseded by UFGS 23 11 20 FACILITY GAS PIPING without revision to comply with MF 2011 in response to CCR 2027.
Note: The last published PDF version of this Section is available in the previous release in the <a href="https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-uf… Archives</a>.

Aug-2017 A C 1

Updated requirements for natural gas compliance with 49 CFR 192.

Feb-2013 A C 2

Added CSST, Gas Shut-off, Pressure Regulator, Bolting Gasket and Identification requirements

Nov-2008 A N

Superseding UFGS 23 11 23.00 10 Gas Piping System and UFGS 23 11 23.00 40 Facility Natural-Gas Piping