<p>Superseded by UFGS 23 11 20 FACILITY GAS PIPING without revision to comply with MF 2011 in response to CCR 2027.</p>
History: Below is a listing of the Revisions and Changes made to this UFGS.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|
May-2020 | A | Nov-2008 | D |
Superseded by UFGS 23 11 20 FACILITY GAS PIPING without revision to comply with MF 2011 in response to CCR 2027. |
|
Aug-2017 | A | Nov-2008 | C | 1 |
Updated requirements for natural gas compliance with 49 CFR 192. |
Feb-2013 | A | Nov-2008 | C | 2 |
Added CSST, Gas Shut-off, Pressure Regulator, Bolting Gasket and Identification requirements |
Nov-2008 | A | Nov-2008 | N |
Superseding UFGS 23 11 23.00 10 Gas Piping System and UFGS 23 11 23.00 40 Facility Natural-Gas Piping |
Comments
Superseded by UFGS 23 11 20
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Superseded by UFGS 23 11 20 FACILITY GAS PIPING without revision to comply with MF 2011 in response to CCR 2027.
Note: The last published PDF version of this Section is available in the previous release in the <a href="https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-uf… Archives</a>.
Updated requirements for
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Updated requirements for natural gas compliance with 49 CFR 192.
Added CSST, Gas Shut-off,
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Added CSST, Gas Shut-off, Pressure Regulator, Bolting Gasket and Identification requirements
Superseding UFGS 23 11 23.00
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Superseding UFGS 23 11 23.00 10 Gas Piping System and UFGS 23 11 23.00 40 Facility Natural-Gas Piping