Status
Retired / Superseded
Publish Date
Archived / Rescinded Date
Change Notice

<p>Superseded by UFGS 23 30 00 HVAC AIR DISTRIBUTION without revision to comply with MF 2011 in response to CCR 2023.</p>

Legacy Title Key
UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems

Comments

Release
PA
Army
Action
Change
Change #
1

Updated table in paragraph 2.10.5.2.1 in response to CCR 3229. Changed reference to Energy Star to PL-109-58 in response to CCR 3488. Added paragraph 1.4. d. in response to CCR 3489. Updated paragraphs 2.1 and 2.2c in response to CCRs 3490 and 3491. Updated paragraph 2.10.1 in response to CCR 7068. Changed section reference from Section 05 50 13 to Section 08 31 00 in response to CCR 8150.

Release
PA
Army
Action
Change
Change #
2

Added bracketed statement to paragraph 2.11.2 in response to CCR 7108. Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.

Release
PA
Army
Action
Revision

Complete review and update including sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

Release
PA
Army
Action
Change
Change #
3

Added pressure test requirements for coils to paragraph 2.12.2.

Release
PA
Army
Action
Change
Change #
4

Updated to coordinate archiving of Navy Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a “Department wide, Open Protocol, Energy Monitoring and Utility Control System Specification” for use in military construction and military family housing activities.

Release
PA
Army
Action
Change
Change #
5

UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".

Release
PA
Army
Action
Change
Change #
6

Added Energy Star requirements

Release
PA
Army
Action
Change
Change #
7

Minimum frame length when Duct Height Greater than 300 mm (12 inches) revised to 127 mm (5 inches)

Release
PA
Army
Action
Change
Change #
8

Added the option for pneumatic or electric damper operator

Release
PA
Army
Action
Revision

Added GEI or SCS certification; allow flexible elastomeric duct liner

Release
PA
Army
Action
Revision

Revised Duct Test Holes and Cleaning and Adjusting in response to CCR's

Release
PA
Army
Action
Revision

Corrections and revision throughout, plus addition of Navy tailoring

Release
PA
Army
Action
Revision

Complete revision of section

Release
PA
Army
Action
Revision

Compliance with CSI SectionFormat

Release
PA
Army
Action
Revision

Incorporated EPAct05 requirements

Release
PA
Army
Action
Revision

Revised seal class A ductwork, registers, outdoor units, filters

Release
PA
Army
Action
Revision

Revised in response to CCR's 228, 231 and 232

Release
PA
Army
Action
Revision

Removed information on extractors and fibrous glass ductwork

Spec. Division
23 - Heating, Ventilating, and Air Conditioning

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
May-2020 A D

Superseded by UFGS 23 30 00 HVAC AIR DISTRIBUTION without revision to comply with MF 2011 in response to CCR 2023.
Note: The last published PDF version of this Section is available in the previous release in the <a href="https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-uf… Archives</a>.

Feb-2020 A C 1

Updated table in paragraph 2.10.5.2.1 in response to CCR 3229. Changed reference to Energy Star to PL-109-58 in response to CCR 3488. Added paragraph 1.4. d. in response to CCR 3489. Updated paragraphs 2.1 and 2.2c in response to CCRs 3490 and 3491. Updated paragraph 2.10.1 in response to CCR 7068. Changed section reference from Section 05 50 13 to Section 08 31 00 in response to CCR 8150.

Nov-2019 A C 2

Added bracketed statement to paragraph 2.11.2 in response to CCR 7108. Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.

Aug-2018 A R

Complete review and update including sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

Feb-2018 A C 3

Added pressure test requirements for coils to paragraph 2.12.2.

Aug-2017 A C 4

Updated to coordinate archiving of Navy Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a “Department wide, Open Protocol, Energy Monitoring and Utility Control System Specification” for use in military construction and military family housing activities.

Aug-2015 A C 5

UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".

Aug-2014 A C 6

Added Energy Star requirements

Feb-2014 A C 7

Minimum frame length when Duct Height Greater than 300 mm (12 inches) revised to 127 mm (5 inches)

May-2013 A C 8

Added the option for pneumatic or electric damper operator

Aug-2010 A R

Added GEI or SCS certification; allow flexible elastomeric duct liner

Nov-2009 A R

Revised Duct Test Holes and Cleaning and Adjusting in response to CCR's

Aug-2009 A R

Corrections and revision throughout, plus addition of Navy tailoring

Nov-2008 A R

Complete revision of section

Apr-2008 A R

Compliance with CSI SectionFormat

Jan-2008 A R

Incorporated EPAct05 requirements

Jul-2007 A R

Revised seal class A ductwork, registers, outdoor units, filters

Oct-2006 A R

Revised in response to CCR's 228, 231 and 232

Apr-2006 A R

Removed information on extractors and fibrous glass ductwork