<p>Superseded by UFGS 23 30 00 HVAC AIR DISTRIBUTION without revision to comply with MF 2011 in response to CCR 2023.</p>
History: Below is a listing of the Revisions and Changes made to this UFGS.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|
May-2020 | A | Aug-2018 | D |
Superseded by UFGS 23 30 00 HVAC AIR DISTRIBUTION without revision to comply with MF 2011 in response to CCR 2023. |
|
Feb-2020 | A | Aug-2018 | C | 1 |
Updated table in paragraph 2.10.5.2.1 in response to CCR 3229. Changed reference to Energy Star to PL-109-58 in response to CCR 3488. Added paragraph 1.4. d. in response to CCR 3489. Updated paragraphs 2.1 and 2.2c in response to CCRs 3490 and 3491. Updated paragraph 2.10.1 in response to CCR 7068. Changed section reference from Section 05 50 13 to Section 08 31 00 in response to CCR 8150. |
Nov-2019 | A | Aug-2018 | C | 2 |
Added bracketed statement to paragraph 2.11.2 in response to CCR 7108. Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE. |
Aug-2018 | A | Aug-2018 | R |
Complete review and update including sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
|
Feb-2018 | A | Aug-2010 | C | 3 |
Added pressure test requirements for coils to paragraph 2.12.2. |
Aug-2017 | A | Aug-2010 | C | 4 |
Updated to coordinate archiving of Navy Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a “Department wide, Open Protocol, Energy Monitoring and Utility Control System Specification” for use in military construction and military family housing activities. |
Aug-2015 | A | Aug-2010 | C | 5 |
UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements". |
Aug-2014 | A | Aug-2010 | C | 6 |
Added Energy Star requirements |
Feb-2014 | A | Aug-2010 | C | 7 |
Minimum frame length when Duct Height Greater than 300 mm (12 inches) revised to 127 mm (5 inches) |
May-2013 | A | Aug-2010 | C | 8 |
Added the option for pneumatic or electric damper operator |
Aug-2010 | A | Aug-2010 | R |
Added GEI or SCS certification; allow flexible elastomeric duct liner |
|
Nov-2009 | A | Nov-2009 | R |
Revised Duct Test Holes and Cleaning and Adjusting in response to CCR's |
|
Aug-2009 | A | Aug-2009 | R |
Corrections and revision throughout, plus addition of Navy tailoring |
|
Nov-2008 | A | Nov-2008 | R |
Complete revision of section |
|
Apr-2008 | A | Apr-2008 | R |
Compliance with CSI SectionFormat |
|
Jan-2008 | A | Jan-2008 | R |
Incorporated EPAct05 requirements |
|
Jul-2007 | A | Jul-2007 | R |
Revised seal class A ductwork, registers, outdoor units, filters |
|
Oct-2006 | A | Oct-2006 | R |
Revised in response to CCR's 228, 231 and 232 |
|
Apr-2006 | A | Apr-2006 | R |
Removed information on extractors and fibrous glass ductwork |
Comments
Superseded by UFGS 23 30 00
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Superseded by UFGS 23 30 00 HVAC AIR DISTRIBUTION without revision to comply with MF 2011 in response to CCR 2023.
Note: The last published PDF version of this Section is available in the previous release in the <a href="https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-uf… Archives</a>.
Updated table in paragraph 2
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Updated table in paragraph 2.10.5.2.1 in response to CCR 3229. Changed reference to Energy Star to PL-109-58 in response to CCR 3488. Added paragraph 1.4. d. in response to CCR 3489. Updated paragraphs 2.1 and 2.2c in response to CCRs 3490 and 3491. Updated paragraph 2.10.1 in response to CCR 7068. Changed section reference from Section 05 50 13 to Section 08 31 00 in response to CCR 8150.
Added bracketed statement to
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Added bracketed statement to paragraph 2.11.2 in response to CCR 7108. Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Complete review and update
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Complete review and update including sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
In response to CCRs 1904 and
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Added pressure test requirements for coils to paragraph 2.12.2.
Updated to coordinate
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Updated to coordinate archiving of Navy Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a “Department wide, Open Protocol, Energy Monitoring and Utility Control System Specification” for use in military construction and military family housing activities.
UFGS sustainability/energy
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Added Energy Star
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Added Energy Star requirements
Minimum frame length when
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Minimum frame length when Duct Height Greater than 300 mm (12 inches) revised to 127 mm (5 inches)
Added the option for
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Added the option for pneumatic or electric damper operator
Added GEI or SCS
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Added GEI or SCS certification; allow flexible elastomeric duct liner
Revised Duct Test Holes and
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Revised Duct Test Holes and Cleaning and Adjusting in response to CCR's
Corrections and revision
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Corrections and revision throughout, plus addition of Navy tailoring
Complete revision of section
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Complete revision of section
Compliance with CSI
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Compliance with CSI SectionFormat
Incorporated EPAct05
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Incorporated EPAct05 requirements
Revised seal class A ductwork
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Revised seal class A ductwork, registers, outdoor units, filters
Revised in response to CCR's
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Revised in response to CCR's 228, 231 and 232
Removed information on
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Removed information on extractors and fibrous glass ductwork