Status
Active
Publish Date
Pages
32
Legacy Title Key
UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS)

Comments

Release
PA
Navy
Action
Change

Updated to clarify cost loading and price and payment procedures.

Release
PA
Navy
Action
Revision

Complete review and update. Added new Related Materials: "Contractor Baseline Schedule General Commissioning/HVAC Review Checklist"

Release
PA
Navy
Action
Change

In response to the following CCRs: CCR 8739, paragraph "Construction Activities" (1.10.2.5.6) has been updated to clarify federal holidays; CCR 8891, clarified schedule deliverables due from the contractor and added checklists for the KTR as attachments (found under Related Materials) ; CCR 8971, revised Note in Submittals Article regarding Design-Build Requirements; and CCR 8823, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: updated paragraphs "Project Baseline Schedule" (1.2.2), Submittal Article SD-01, and "DESIGNATED PROJECT SCHEDULER" (1.9).

Release
PA
Navy
Action
Change

Updated section to include the required Oracle Primavera P6 software settings to be utilized in preparation and maintenance of the construction schedule and the tabular reports required to be submitted with each monthly invoice.

Release
PA
Navy
Action
Change

Corrected notes and paragraphs, for DB and DBB, on Baseline NAS submittals and requirements.

Release
PA
Navy
Action
Revision

Combined with Design-Build Section 01 32 17.05 20. Updated Activity Identification and Organization, Design Activities, and Time Impact Analysis. Added Commissioning Activities.

Release
PA
Navy
Action
Change

Revised the Time Impact Analysis (TIA) action for Concurrent Delays

Release
PA
Navy
Action
Change

Administrative changes to use of "must." Modified Monthly Network Analysis and Contract Administration paragraphs.

Release
PA
Navy
Action
Revision

Title changed from NETWORK ANALYSIS SCHEDULES (NAS); thoroughly revised to Primavera P6, Updated WBS & Activity Codes and Settings.

Release
PA
NASA
Action
Change

Modified subparts 1.4 and 1.4 to add Primavera P6

Release
PA
Navy
Action
Revision

Revised first note in subpart 1.6.2.5

Release
PA
Navy
Action
Revision

INTERIM RELEASE: Section revised

Release
PA
Navy
Action
Revision

Major revision

Release
PA
Navy
Action
Revision

Deleted requirements for WEBCM

Release
PA
Navy
Action
Revision

Deleted [DESIGN BUILD] from the title and Design-Build requirements from the section.

Spec. Division
01 - General Requirements
CCR