UFGS 01 32 16.00 20 Small Project Construction Progress Schedules

Comments

Release
PA
Navy
Action
Change
Change #
1

In response to the following CCRs: CCR 8738, clarified adverse weather requirements and schedule modifications required due to non-work days in paragraph "Anticipated Weather Lost Work Days" (1.3.1.2); CCRs 8822 and 9013, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and updated paragraph "PRE-CONSTRUCTION SCHEDULE REQUIREMENT" (1.2).

Release
PA
Navy
Action
Revision

Updated Scheduling software settings and requirements and tailoring.  Added Design-Build Requirements.

Release
PA
Navy
Action
Change
Change #
2

Revised the Time Impact Analysis (TIA) action for Concurrent Delays.

Release
PA
Navy
Action
Change
Change #
3

Administrative changes to use of "must." Modified Monthly Network Analysis and Contract Administration paragraphs.

Release
PA
Navy
Action
Revision

Title changed from CONSTRUCTION PROGRESS DOCUMENTATION; thoroughly revised Schedule Format, Schedule Monthly Updates, and Contract Modification.

Release
PA
Navy
Action
Revision

Major revision

Spec. Division
01 - General Requirements
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2020 N C 1

In response to the following CCRs: CCR 8738, clarified adverse weather requirements and schedule modifications required due to non-work days in paragraph "Anticipated Weather Lost Work Days" (1.3.1.2); CCRs 8822 and 9013, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and updated paragraph "PRE-CONSTRUCTION SCHEDULE REQUIREMENT" (1.2).

Aug-2018 N R

Updated Scheduling software settings and requirements and tailoring.  Added Design-Build Requirements.

Nov-2015 N C 2

Revised the Time Impact Analysis (TIA) action for Concurrent Delays.

May-2015 N C 3

Administrative changes to use of "must." Modified Monthly Network Analysis and Contract Administration paragraphs.

Feb-2015 N R

Title changed from CONSTRUCTION PROGRESS DOCUMENTATION; thoroughly revised Schedule Format, Schedule Monthly Updates, and Contract Modification.

Nov-2009 N R

Major revision