UFGS 23 07 00 Thermal Insulation for Mechanical Systems
Spec. Division
23 - Heating, Ventilating, and Air Conditioning
CCR
Comments
Complete review and update.
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Complete review and update.
Updated paragraph 2.2.9.2.2
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Updated paragraph 2.2.9.2.2 in response to CCR 6151.
Added reference to paragraph
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Added reference to paragraph 2.4.1.2 in response to CCR 4249 and updated paragraph 3.2.2.3.4 in response to CCR 4256.
Incorporated dispersal of
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Sustainability updates
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Added pressure test
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
In response to CCR 5445, added note to paragraph 3.2.1.6 for NAVFAC MAR Projects
Added new paragraphs 2.4.1.4
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Added new paragraphs 2.4.1.4 and 2.4.2.7 per Mechanical DWG.
UFGS sustainability/energy
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Revised vapor barrier and
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Revised vapor barrier and insulation requirements.
Interim Update: Removed
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
INTERIM RELEASE: Removed polyisocyanurate insulation throughout the section.
CCR 836: deleted aboveground
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
CCR 836: deleted aboveground cold pipe phenolic insulation
Added GEI or SCS
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Added GEI or SCS certification; CCR 3250
Revised firestopping to close
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Revised firestopping to close a CCR
Compliance with CSI
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Compliance with CSI SectionFormat
Incorporated EPAct05
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Incorporated EPAct05 requirements
General revisions for pipe,
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
General revisions for pipe, duct and equipment
Minor change to paragraph
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Minor change to paragraph Vapor Barrier/Weatherproofing Jacket
Corrected permeability
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
INTERIM RELEASE: Corrected permeability
Added jacketing system
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Added jacketing system
Various minor revisions
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Various minor revisions