Status
Active
Publish Date
Pages
34
Legacy Title Key
UFGS 08 34 16.20 Vertical Lift Fabric Doors

Comments

Release
PA
Navy
Action
Change

Corrected wind velocities in Wind Loads paragraph (1.3.2.1) to coordinate with UFC 3-301-01.

Release
PA
Navy
Action
Change

Targeted update to incorporate recent lessons learned for wire-rope termination, safety arresters, performance standards, warranty and other safety items.

Release
PA
Navy
Action
Revision

General periodic update to incorporate new fabric door technologies, materials and design methodologies to increase door performance and industry competition.

Release
PA
Navy
Action
Revision

Major revision; state-of-the-art study to improve VLFD reliability, improve performance requirements and increase vendor competitiveness.

Release
PA
Navy
Action
Change

Modified subparts 1.4.1, 1.5.1, 1.5.3; document was released 7/12

Release
PA
Navy
Action
Revision

Changes to windload requirements

Spec. Division
08 - Openings
CCR