Status
Active
Publish Date
Pages
32
Legacy Title Key
UFGS 07 22 00 Roof and Deck Insulation

Comments

Release
PA
Navy
Action
Revision

Complete review and update including the incorporation of CCRs.

Release
PA
Navy
Action
Change

Added notes to consider use of polystyrene as a roof insulation in humid or ESC C3-C5 locations and not to use wood fiberboard in humid or ESC C4-C5 locations.

Release
PA
Navy
Action
Change

Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

Release
PA
Navy
Action
Change

CCR 5475: Changed terminology within this section from “Protection Board” to “Cover Board”.

Release
PA
Navy
Action
Revision

Complete revision; revised throughout to incorporate CCRs 4254, 2807; update format and editorial changes.

Release
PA
Navy
Action
Change

Modified subpart 1.4.3

Release
PA
Navy
Action
Revision

Modified subparts 1.2, 2.1.1, 2.1.3, 3.1.1; Added subparts 1.4.4 , 1.4.5 and 2.2.2

Release
PA
Navy
Action
Revision

Reference updates: Modified General Note, subparts 1.2 (note) and 2.1.1

Release
PA
Navy
Action
Revision

Added GEI or SCS certification

Release
PA
Navy
Action
Revision

Reference changed from FM AS 4470 to FM 4470

Release
PA
Navy
Action
Revision

Incorporated NASA requirements

Spec. Division
07 - Thermal and Moisture Protection
CCR