Status
Retired / Superseded
Publish Date
Archived / Rescinded Date
Change Notice

<p>Superseded by UFGS 23 52 30.00 10 HEAT RECOVERY BOILERS without revision to comply with MF 2011 in response to CCR 2031.</p>

Legacy Title Key
UFGS 23 52 43.00 10 Heat Recovery Boilers

Comments

Release
PA
Army
Action
Change
Change #
1

Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).

Release
PA
Army
Action
Revision

Compliance with CSI SectionFormat

Release
PA
Army
Action
Revision

Incorporated EPAct05 requirements

Release
PA
Army
Action
Revision

Updated seismic criteria

Release
PA
Army
Action
New

New - Superseding UFGS 42 11 23.00 10 Heat Recovery Boilers

Spec. Division
23 - Heating, Ventilating, and Air Conditioning

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
May-2020 A D

Superseded by UFGS 23 52 30.00 10 HEAT RECOVERY BOILERS without revision to comply with MF 2011 in response to CCR 2031.
Note: The last published PDF version of this Section is available in the previous release in the <a href="https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-uf… Archives</a>.

Aug-2017 A C 1

Changed Material Safety Data Sheets (MSDS) to Safety Data Sheets (SDS).

Apr-2008 A R

Compliance with CSI SectionFormat

Jan-2008 A R

Incorporated EPAct05 requirements

Oct-2007 A R

Updated seismic criteria

Jul-2006 A N

New - Superseding UFGS 42 11 23.00 10 Heat Recovery Boilers