Status
Retired / Superseded
Publish Date
Archived / Rescinded Date
Change Notice
Archived with no replacement.
Legacy Title Key
UFGS 22 05 48.00 20 Mechanical Sound, Vibration, and Seismic Control

Comments

Release
PA
Navy
Action
Change
Change #
1

CCR 985 and CCR 2715: Revised technical note in subpart 1.4.5 by deleting UFC 3-450-02 and replacing P-355 with UFC 3-310-04. Revised technical note in subparts 1.4.6, 1.4.6.2, and Part 2 by replacing DM 3.10 with UFC 3-450-01.

Release
PA
Navy
Action
Revision

To conform with CSI MasterFormat, replacing without change UFGS-15070N (September 1999)

Spec. Division
22 - Plumbing

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
May-2015 N C 1

CCR 985 and CCR 2715: Revised technical note in subpart 1.4.5 by deleting UFC 3-450-02 and replacing P-355 with UFC 3-310-04. Revised technical note in subparts 1.4.6, 1.4.6.2, and Part 2 by replacing DM 3.10 with UFC 3-450-01.

Apr-2006 N R

To conform with CSI MasterFormat, replacing without change UFGS-15070N (September 1999)