Status
Active
View/Download
/FFC/DOD/UFGS/UFGS%2010%2014%2000.20.pdf
/FFC/DOD/UFGS/UFGS%2010%2014%2000.20.zip
Publish Date
Pages
25
Spec. Division
10 - Specialties
CCR
History: Below is a listing of the Revisions and Changes made to this UFGS.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|
Nov-2018 | A | Aug-2017 | C | 2 | Added note and material requirements for panels, brackets, fasteners, and hardware for unoccupied spaces and high humidity and ESC C4-C5 locations and for standard room signs in humid and C3-C5 locations. |
Aug-2018 | A | Aug-2017 | C | 1 | Added bracketed item to paragraph 1.4.1 in response to CCR 6638. |
Aug-2017 | A | Aug-2017 | R | Complete review and update including sustainability updates, formatting to meet UFC 1-300-02, reference updates and general revisions. | |
Aug-2017 | A | Aug-2017 | R | Complete review and update including sustainability requirements. | |
Nov-2012 | A | Nov-2012 | N | Superseding UFGS 10 14 02 Interior Signage. Update of the entire section. |