Status
Active
View/Download
Publish Date
Pages
38
Legacy Title Key
UFGS 09 69 13 Rigid Grid Access Flooring
Spec. Division
09 - Finishes
CCR
History: Below is a listing of the Revisions and Changes made to this UFGS.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|
Aug-2018 | A | Nov-2015 | C | 1 |
Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Nov-2015 | A | Nov-2015 | R |
UFGS refresh review and update. |
|
Nov-2010 | A | Nov-2010 | R |
Revised Air Leakage paragraph |
|
Aug-2010 | A | Aug-2010 | R |
Updated criteria for applying loads allowed, deflection and size of panels to coincide with industry |
|
Apr-2007 | A | Apr-2007 | N |
Combined UFGS 09 69 00 Access Flooring and 09 69 00.00 40 Access Flooring (NASA) and disassembled |
Comments
Sustainability updates
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:28
Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
UFGS refresh review and
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:28
UFGS refresh review and update.
Revised Air Leakage paragraph
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:28
Revised Air Leakage paragraph
Updated criteria for applying
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:28
Updated criteria for applying loads allowed, deflection and size of panels to coincide with industry
Combined UFGS 09 69 00 Access
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:28
Combined UFGS 09 69 00 Access Flooring and 09 69 00.00 40 Access Flooring (NASA) and disassembled