Status
Active
Publish Date
Pages
26
Legacy Title Key
UFGS 08 51 23 Steel Windows

Comments

Release
PA
Navy
Action
Change
Change #
1

In response to CCR 10430, corrected specifier note for electrical CSI division, provided Army tailoring option for specific submittals within Submittal Article (1.2), and removed brackets from Thermal Performance paragraph (1.5.2)

Release
PA
Navy
Action
Revision

This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.

Release
PA
Navy
Action
Change
Change #
2

Added note restricting use of steel windows in humid and ESC C3-C5 locations.

Release
PA
Navy
Action
Change
Change #
3

Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

Release
PA
Navy
Action
Change
Change #
4

CCR 4166: Removed subpart 2.2.6 and reference ASTM A167

Release
PA
Navy
Action
Change
Change #
5

UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".

Release
PA
Navy
Action
Revision

Modified references in subpart 2.7.2

Release
PA
Navy
Action
Revision

Corrected Reference Identifier (RID) tags for LEED

Release
PA
Navy
Action
Revision

Added ATFP requirements

Release
PA
Navy
Action
Revision

Added NASA requirements and sustainable design requirements

Spec. Division
08 - Openings
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Feb-2022 N C 1

In response to CCR 10430, corrected specifier note for electrical CSI division, provided Army tailoring option for specific submittals within Submittal Article (1.2), and removed brackets from Thermal Performance paragraph (1.5.2)

Aug-2020 N R

This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.

Nov-2018 N C 2

Added note restricting use of steel windows in humid and ESC C3-C5 locations.

Aug-2018 N C 3

Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

May-2016 N C 4

CCR 4166: Removed subpart 2.2.6 and reference ASTM A167

Aug-2015 N C 5

UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".

Aug-2011 N R

Modified references in subpart 2.7.2

Nov-2008 N R

Corrected Reference Identifier (RID) tags for LEED

Aug-2008 N R

Added ATFP requirements

Jul-2006 N R

Added NASA requirements and sustainable design requirements