Status
Active
Publish Date
Pages
34
Legacy Title Key
UFGS 08 34 16.20 Vertical Lift Fabric Doors

Comments

Release
PA
Navy
Action
Change
Change #
1

Corrected wind velocities in Wind Loads paragraph (1.3.2.1) to coordinate with UFC 3-301-01.

Release
PA
Navy
Action
Change
Change #
2

Targeted update to incorporate recent lessons learned for wire-rope termination, safety arresters, performance standards, warranty and other safety items.

Release
PA
Navy
Action
Revision

General periodic update to incorporate new fabric door technologies, materials and design methodologies to increase door performance and industry competition.

Release
PA
Navy
Action
Revision

Major revision; state-of-the-art study to improve VLFD reliability, improve performance requirements and increase vendor competitiveness.

Release
PA
Navy
Action
Change
Change #
3

Modified subparts 1.4.1, 1.5.1, 1.5.3; document was released 7/12

Release
PA
Navy
Action
Revision

Changes to windload requirements

Spec. Division
08 - Openings
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2024 N C 1

Corrected wind velocities in Wind Loads paragraph (1.3.2.1) to coordinate with UFC 3-301-01.

Nov-2021 N C 2

Targeted update to incorporate recent lessons learned for wire-rope termination, safety arresters, performance standards, warranty and other safety items.

Aug-2021 N R

General periodic update to incorporate new fabric door technologies, materials and design methodologies to increase door performance and industry competition.

May-2014 N R

Major revision; state-of-the-art study to improve VLFD reliability, improve performance requirements and increase vendor competitiveness.

Aug-2012 N C 3

Modified subparts 1.4.1, 1.5.1, 1.5.3; document was released 7/12

Oct-2006 N R

Changes to windload requirements