View/Download
Publish Date
Pages
205
Legacy Title Key
BIPS 03 Integrated Rapid Visual Screening of Tunnels
Summary
The primary purpose of the IRVS of tunnels is to rank the risk in a group of tunnels in a transportation system or region. The results of an IRVS can also be used in infrastructure-specific risk assessments and higher level assessments of threats, consequences, and vulnerabilities.