View/Download
Publish Date
Pages
22
Legacy Title Key
UFGS 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment
Spec. Division
23 - Heating, Ventilating, and Air Conditioning
Comments
Revision: Update technical
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Revision: Update technical requirements, references format, and incorporate the following CCRs: 6858, 7126
Tri-Annual Database
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Tri-Annual Database Maintenance (TADM) completed
Modified Submittal Article;
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Modified Submittal Article; minor changes to the heading titles in table to resolve the issues of the CCR #589; imperative language; added some TST tags
Per CCR 1798, subpart 2.1 -
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Per CCR 1798, subpart 2.1 - revised Chapter No, per CCR 589 made some changes to the "headings" in the tables due to comment in CCR in the following subparts: 2.2.1 - 2.2.6, 2.2.9 - 2.2.11
uperseding UFGS 23 05 48
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Renumbered to NASA fifth level; Superseding UFGS 23 05 48 with no title change
Renumbered to UFGS 23 05 48
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Renumbered/ Superseding UFGS 23 05 48 with no title change
Note: The last published PDF version of this Section is available in the previous release in the <a href="https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-uf… Archives</a>.
Title changed from VIBRATION
Submitted by klloyd@nibs.org on Thu, 05/29/2025 - 20:29
Title changed from VIBRATION ISOLATION FOR AIR CONDITIONING EQUIPMENT; Reference and Section References (SRF) updated