Status
Active
Legacy Title Key
FF&E COST ESTIMATING
Summary

This series includes the documents below. Download each file individually on the Collateral Equipment (FF&E) Criteria & Templates homepage.

  • FF&E Cost Estimating Guide
  • FF&E Cost Worksheet

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion